search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
155 new news items in the last 24 hours
  1. Home
  2. Economy
5 hours ago

Simtel Team has signed a €17.5 million contract for a solar power plant in Alba

Sanziana Georgescu
whatsapp
facebook
linkedin
x
copy-link copy-link
16 October 2026, 08:21
main event image
Economy
Unsplash
google-preference

Always see our news on Google

Simtel Team has signed an engineering, procurement and construction (EPC) contract worth approximately €17.5 million, excluding VAT, with Vienna Energy Forță Naturală, a Romanian renewable energy company wholly owned by Wien Energie Internațional, part of the Austrian energy group Wien Energie.

The project involves developing a solar power plant in the Bărăbanț area of Alba Iulia, Alba County, as well as building the associated high-voltage substation. The contract was announced on the Bucharest Stock Exchange and represents a new stage in Simtel Team’s expansion in the renewable energy projects segment.

Under the agreement, Simtel Team will handle all the main stages of the EPC project: the design, supply of equipment, construction, installation, commissioning and testing of the solar power plant and electrical substation.

The construction period is estimated at approximately 16 months from the official notification to begin the works, according to the schedule agreed by the two companies. The contract covers both the works for the solar energy generation facility and the infrastructure required to connect it to the high-voltage grid.

גב,

Sources

sursa imagine
Economedia
Simtel semnează un contract de 17,5 milioane de euro pentru o centrală fotovoltaică în Alba Iulia
sursa imagine
Capital
Simtel Team va construi o centrală fotovoltaică de 17,5 milioane de euro. Lucrările vor dura 16 luni

Latest News

15:58

All airports in Moscow were closed after Ukrainian drone attacks, and over 200 flights were canceled or delayed

15:52

KFC is replacing Pepsi with Coca-Cola at its U.S. restaurants after nearly 40 years of partnership with PepsiCo

15:52

The Japan Meteorological Agency withdrew a seismic alert issued in error after eight minutes

15:48

Edge Institute is organizing a summit on digital identity and artificial intelligence in public administration on Monday at Cotroceni Palace

15:48

George Pușcaș, questioned by DIICOT in the Nordis case

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Simtel Team announces the completion of the PNRR funding settlement for the photovoltaic park in Giurgiu / The company contests the settled amount.
event image
Current Affairs
Solar Lady, the largest solar power plant in Europe, has received the establishment authorization from ANRE for the first phase of the project.
event image
Current Affairs
Rompetrol will build a 4.8 MW photovoltaic power plant at the Vega Ploiești Refinery, with an investment of 27 million lei
event image
Economy
MVM Energie Romania has received ANRE authorization for the development of a photovoltaic park in Covasna. The project will be carried out on 20 hectares.
event image
Politics
Ilie Bolojan announces €650 million in funding for photovoltaic panels and storage systems intended for public institutions
event image
Economy
Hidroelectrica is investing RON 296.8 million in a 64 MW battery storage system at Iron Gates II
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Bucharest Stock Exchange Simtel Team renewable energy Wien Energie Bărăbanț Alba Iulia

Editor’s Recommendations

main event image
Current Affairs
1 hour ago

The PNL must repay the Permanent Electoral Authority over 14 million lei for Nicolae Ciucă’s election campaign / The High Court of Cassation and Justice definitively dismissed the appeal filed by the Liberals

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
main event image
Opinions
5 hours ago
Editorials and opinions

Political perspectives after the investiture of the Niculescu Government

main event image
Opinions
Yesterday 09:19

Andrei Pleșu: Notes (states, days). The “politics-technocracy” dichotomy

main event image
Exclusive
5 hours ago

EXCLUSIV E-TRENDS by NewsVibe. The ranking of trending economic topics over the past week / The acquisition of Mangalia Shipyard at the forefront of online discussions

main event image
Exclusive
4 hours ago

SPECIAL Informat.ro / Romania in the European press: Top topics from the past two weeks. Incidents in the Black Sea dominate the agenda

main event image
Exclusive
6 hours ago
Original Content

EXCLUSIVE | October 16, 2026. Online Search Trends / Last 24 Hours

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol