search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
169 new news items in the last 24 hours
  1. Home
  2. Politics

Ilie Bolojan announced that the postponement of the closure of the lignite power plants in Turceni and Craiova could lead to losses of up to 100 million euros from the PNRR.

Raluca Ioana Draghici
whatsapp
facebook
linkedin
x
copy-link copy-link
28 August 2026, 20:01
main event image
Politics
Shutterstock
google-preference

Always see our news on Google

The interim Prime Minister of Romania, Ilie Bolojan, stated that the postponement of the closure of the lignite power plants in Turceni and Craiova could cause losses of up to 100 million euros from the National Recovery and Resilience Plan (PNRR).

These losses add to the 700 million euros already lost due to the failure to adopt the public sector salary law.

Bolojan explained that Romania committed to reducing the capacity of coal power plants in order to receive European funds, but decided to postpone their closure for social reasons, to avoid a lack of heating in Craiova next winter.

Additionally, the Prime Minister mentioned that unfinished projects will lose funding, being shifted from grants to loans with higher interest rates.

Bolojan criticized previous governments for delaying the implementation of necessary reforms, emphasizing that these losses are the result of a lack of responsibility.

Sources

sursa imagine
Antena3
Ilie Bolojan anunță că România va pierde şi 100 de milioane de euro din PNRR din cauza centralelor pe cărbune
sursa imagine
Economica
Bolojan: Menţinerea centralelor pe cărbune va determina pierderea a până la 100 de milioane de euro din PNRR
sursa imagine
Digi24
Câți bani pierde România din PNRR pentru că amână închiderea centralelor pe cărbune. Se adaugă celor pierduți cu legea salarizării
sursa imagine
Financial Intelligence
Bolojan: Menţinerea centralelor pe cărbune va determina pierderea a până la 100 de milioane de euro din PNRR
sursa imagine
Profit.ro
ANUNȚ Bolojan: România poate pierde până la 100 milioane euro pentru că amână închiderea producției de energie pe bază de lignit de la Turceni și Craiova

Latest News

22:55

Cristian Bușoi, Secretary of State at the Ministry of Energy, assures that Romanians will not receive double electricity bills for the same consumption next winter

22:48

Police conducted searches in a case involving card fraud after foreign tourists were allegedly deceived in the Old Town.

22:22

Radu Miruță announces measures for Romanian grain exports and denies that Ukrainian trains are being prioritized at the Port of Constanța

22:14

Marco Rubio urges Europe to “wake up from sleep” and strengthen its defense

21:54

Bulgaria invites Romania and Turkey for consultations after drone attacks on commercial vessels in the Black Sea

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Interim Prime Minister Ilie Bolojan says that Romania has lost funds through the PNRR due to delays in the implementation of projects.
event image
Politics
Dragoș Pîslaru warned that amendments to the decarbonization legislation could block payment requests from the PNRR and could lead to losses of billions of euros.
event image
Politics
Dragoș Pîslaru accuses PSD and AUR of putting the money from PNRR at risk after the Senate vote on decarbonization: "It's an absolute blockage, requested by no one, made for a populist issue."
event image
Politics
The Senate voted to cancel the closure of coal-fired power plants, adopting amendments that allow for their reopening / Ilie Bolojan warns about penalties from the EU
event image
Current Affairs
The Romanian government has decided to extend the operation of the lignite power plants in Turceni and Craiova.
event image
Current Affairs
Ilie Bolojan requests the completion of about 4500 projects in the next two weeks
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Ilie Bolojan NRRP coal-fired power plants Loss termocentrala Turceni Craiova

Editor’s Recommendations

main event image
International
Yesterday 19:05

International Energy Agency ready to release additional oil and diesel reserves

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
main event image
Exclusive
Yesterday 09:55

ANALYSIS France’s overlapping crises and the lessons for Europe and Romania

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol