30 September 14:22
Current Affairs
Captura de ecran: https://www.facebook.com/photo/?fbid=1178115494351640&set=pcb.1178136567682866
Starting from May 28, 2025, the TBM 'Sfânta Ana' has begun excavating the tunnel on Line 1, marking the completion of the first segment of tunnel for Metro Line 6. So far, 900 m have been excavated and 600 tunnel rings have been assembled. Work continues with significant progress at the Tokyo, Băneasa Airport, and Băneasa Train Station, where considerable excavations and concrete works have been completed. Important structures have also been finalized at Ion I.C. Brătianu Station and Otopeni Airport. Metro Line 6 will connect 1 Mai Station with Otopeni Airport, having a total length of 7.6 km.
Sources
VIDEO&FOTO Pas important la metroul spre Aeroportul Otopeni. Utilajul gigant "Sfânta Ana" a ajuns la Aeroportul Băneasa
VIDEO Metroul de Otopeni: "Sfânta Ana" a ajuns la viitoarea stație Aeroport Băneasa - Economica.net
Metrorex: Utilajul Sfânta Ana a finalizat al doilea tunel între staţiile Tokyo şi Aeroport Băneasa
VIDEO | Cârtița “Sfânta Ana” a străpuns azi peretele viitoarei stații Aeroport Băneasa de pe M6, metroul spre Otopeni, după un drum de 4 luni. Pe linia 2 sapă tunel „Sfânta Maria”