search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
148 new news items in the last 24 hours
  1. Home
  2. Current Affairs

CNIR is analyzing seven route options for the Bucharest–Giurgiu Motorway

Cristiana Dida
whatsapp
facebook
linkedin
x
copy-link copy-link
3 September 2026, 10:27
main event image
Current Affairs
Foto: shutterstock.com
google-preference

Always see our news on Google

The National Road Investment Company (CNIR) is analyzing seven route options for the Bucharest–Giurgiu Motorway, the first high-speed road designed at Romania’s border with Bulgaria. The project will connect Bucharest, Giurgiu and the future Giurgiu–Ruse 2 Bridge, as well as link up with Bulgaria’s Ruse–Veliko Tarnovo motorway.


The proposals submitted by the designer provide connections with the A1 Bucharest–Pitești, the A0 Bucharest Ring Motorway and the A2 Sun Motorway, as well as with the future A6 Bucharest–Alexandria motorway. The investment aims to improve transport between the capital and Giurgiu, increase road safety and reduce pollution.


CNIR will assess the options through a multi-criteria analysis that takes into account terrain conditions, traffic, and technical, economic and environmental criteria. The two highest-ranked routes will be analyzed in the next stage.


The design contract is worth 33 million lei and has a duration of 18 months. The designer is an association led by Activ Proiectare Infrastructură.


On the Bulgarian side, the Ruse–Veliko Tarnovo motorway is 132.84 kilometers long. The Ruse–Byala section and the Byala bypass are at various stages of preparation and construction, with completion estimated by the end of 2028. The Byala–Veliko Tarnovo segment is temporarily stalled after the tender was suspended due to irregularities in the evaluation of bids.

Sources

sursa imagine
Hot News
Noua autostradă care urmează să plece din București. Are șapte variante de traseu și va lega Capitala de un punct vital pentru turiști
sursa imagine
Economedia
Autostrada București-Giurgiu: 7 trasee analizate
sursa imagine
B365
7 variante de traseu pentru Autostrada București-Giurgiu sunt în analiză. Drumul de mare viteză ne va lega de Podul Giurgiu-Ruse 2, apoi de autostrada Ruse-Veliko Tarnovo
sursa imagine
EVZ.ro
Autostrada care va lega Bucureștiul de Bulgaria
sursa imagine
Agerpres
Șapte variante de traseu, în analiză pentru Autostrada București - Giurgiu

Latest News

22:57

Duncan was born on North Ronaldsay Island, the first recorded birth there in 34 years

22:55

The United Kingdom leads the International Emmy nominations, with 14 selections

22:51

Radu Miruță announced that Romania will receive counter-drone capabilities through SAFE / Deliveries will begin in the middle of next year

22:47

A Romanian man was caught by the Carabinieri after forcing his way through a company’s fence in Italy and stealing copper cables

22:33

The government approves the Brașov–Făgăraș Motorway project, spanning nearly 50 kilometers and costing 9.35 billion lei

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Romania, Bulgaria and Greece are preparing joint applications through the Connecting Europe Facility for the development of the Baltic Sea–Black Sea–Aegean Sea corridor
event image
Current Affairs
The modernization project of the Bucharest-Giurgiu railway line has reached 12% of the work progress, with the reopening of traffic estimated for September 2028.
event image
Current Affairs
Lot 6 of the Craiova-Târgu Jiu expressway will have 19.25 km, a viaduct, parking lots with electric charging stations, and a road junction.
event image
Current Affairs
CNAIR announces more than 1,477 km of high-speed roads and calls for digitalization, maintenance and additional staff
event image
Current Affairs
Rail traffic on the Danube Bridge between Bulgaria and Romania will be completely suspended between April 5 and December 13, 2027, due to electrification works and the restoration of the railway infrastructure.
event image
Current Affairs
CNAIR is preparing the tender for another motorway, nearly 50 kilometers long
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
route analysis highway Bucharest Giurgiu CNIR highway a1 highway A0 highway a2

Editor’s Recommendations

main event image
Exclusive
11 hours ago

ANALYSIS How political chaos turned the leu into a currency under siege

main event image
Opinions
13 hours ago

Andrei Pleșu: What Is Allowed and What Is Not

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol