search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
147 new news items in the last 24 hours
  1. Home
  2. Current Affairs
Yesterday 12:36

CNAIR is preparing the tender for another motorway, nearly 50 kilometers long

Gabriel Dumitrache
whatsapp
facebook
linkedin
x
copy-link copy-link
24 September 2026, 12:36
main event image
Current Affairs
Foto: Shutterstock
google-preference

Always see our news on Google

The Brașov–Făgăraș Motorway project has entered the stage of finalizing the technical documentation after the related documentation for submission to the Government was approved in June. Once the technical design and the PAC and PTE documentation have been completed, CNAIR intends to launch the tender for the construction works.

The motorway will be approximately 50 kilometers long, while construction is expected to take 36 months. The investment is estimated at 7.74 billion lei, excluding VAT. The works contract is expected to be awarded under a FIDIC Red Book model.

The route will include the Codlea Sud, Codlea Nord and Șercaia interchanges, as well as 49 bridges, overpasses and viaducts. It will also feature an S3-type service area, a short-stay parking area and a Maintenance and Coordination Center.

To protect wildlife, three cut-and-cover structures or covered galleries will be built, with a combined length of approximately 800 meters, which will also function as wildlife crossings. The project has an environmental permit and an estimated internal economic rate of return of 13.10%.

The motorway will connect the Brașov area with Făgăraș, link the center of the country to the national motorway network and provide a connection to the future Sibiu–Făgăraș Motorway. The investment is intended to improve traffic flow, reduce travel times and pollution, and enhance road safety.

Sources

sursa imagine
Profit.ro
FOTO DECIZIE pentru o nouă autostradă. Guvernul a aprobat datele tehnice pentru Autostrada Brașov-Făgăraș, care va costa peste 9,3 miliarde lei
sursa imagine
Stirile ProTV
Se construiesc încă 50 de kilometri de autostradă. Guvernul a dat undă verde

Latest News

08:12

EXCLUSIVE | September 25, 2026. Online Search Trends / Past 24 Hours

08:10

Emmanuel Macron warns of the energy crisis / Sends “military assets” to Saudi Arabia

08:06

Start for the Tricolors in the 2026/27 Nations League edition. What time does Sweden - Romania start? Who is broadcasting the match? Starting lineup

07:52

The Secretary of State in the Ministry of Energy, Cristian Bușoi, announces that Romania’s gas storage facilities are 79% full, above the European average

07:50

Finland’s President asks Elon Musk to expand Starlink access for Ukraine’s strategic operations

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
The government approves the Brașov–Făgăraș Motorway project, spanning nearly 50 kilometers and costing 9.35 billion lei
event image
Current Affairs
A new section of the Sibiu-Pitești Highway could be opened this year
event image
Current Affairs
The physical stage of section 3 of the Sibiu-Pitești Highway (Cornetu-Tigveni) has reached almost 15% / The completion of the works depends on obtaining the Revised Environmental Agreement.
event image
Economy
CNAIR announces progress of over 60% on the A7 Bacău–Pașcani Motorway and the opening of at least 49 kilometers this year
event image
Current Affairs
A1 Highway Sibiu – Pitești: The Robești Tunnel has been completely pierced
event image
Current Affairs
The deadline for completing the road works on the Comarnic Belt is set around the date of August 24.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
CNAIR Brasov Fagaras Mountains highway

Editor’s Recommendations

main event image
Politics
1 hour ago

The designated prime minister, Siegfred Mureşan, says that the times when the PSD was a 45% party are over and will not return / “The old days, when they were a great 45% empire, will never return”

Sources
imagine sursa
imagine sursa
main event image
Opinions
Yesterday 08:57

Andrei Pleșu: What Is Allowed and What Is Not

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol