search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
105 new news items in the last 24 hours
  1. Home
  2. Economie

ELCEN confirms the safe operation of the power plants and the delivery of thermal agent in the Capital, but emphasizes the large water losses in the heating network.

Matei Gaginsky
whatsapp
facebook
linkedin
x
copy-link copy-link
12 January 2026, 13:56
main event image
Current Affairs
Foto: unsplash.com
google-preference

Always see our news on Google

Electrocentrale București (ELCEN) informs that its power plants operate in safe conditions, delivering thermal agent to the heating system of the Capital. The temperatures delivered by the four power plants are in accordance with the orders, however, any request to increase the flow could lead to exceeding contractual parameters and risks of damage. ELCEN emphasizes that the heating system is interdependent, and the return parameters influence the balance of the entire system.


Currently, the system loses over 2000 tons of water per hour, which is double the accepted norm, putting the installations under stress and reducing their lifespan. Any increase in flows must be accompanied by a reduction in network losses to ensure safe operation. ELCEN warns that forcing the flows under these conditions can lead to serious damage.

Sources

sursa imagine
Economica
De ce nu e suficientă căldură în București? 2.000 de tone de apă fierbinte se duc din rețea în pământ în fiecare oră, spune Elcen
sursa imagine
Newsweek
De ce bucureștenii nu au suficientă căldură? ELCEN: 2.000 tone de apă fierbinte se pierd în fiecare oră

Latest News

23:08

Nicușor Dan argues that anyone who repressed during the Revolution has no place in a high position, but Pahonțu is not in this situation.

22:38

A commercial ship caught fire in the Black Sea. Nicușor Dan: It was hit and seems to have sunk.

22:20

Nicușor Dan, after the trilateral meeting in Chișinău: Romania, the Republic of Moldova, and Ukraine will continue collaboration in the fields of infrastructure, energy, and security.

22:01

Péter Magyar: Paks operates at maximum capacity / The nuclear power plant in Romania, previously cited as an example, has been shut down for two weeks.

21:38

UEFA has conducted the draw for the main stage of the Champions League / Liverpool and Real for Chivu

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
ELCEN has announced the preventive shutdown of the energy group at CET Grozăvești due to extreme temperatures.
event image
Current Affairs
Major breakdown on the Berceni Pipeline: Sector 4 remains without hot water
event image
Current Affairs
Hundreds of blocks in Bucharest have been left without hot water due to works on the heating network. The repairs will last until Friday.
event image
Current Affairs
Modernization works announced for the thermal network in Bucharest: 1,500 blocks will remain without hot water
event image
Current Affairs
ELCEN will temporarily stop the natural gas supply to the Grozăvești power plant on Monday. The intervention will last six hours.
event image
Current Affairs
ELCEN will temporarily stop CET Grozăvești on Sunday night, August 16, for the relocation of the flow meter, with minimal impact on consumers.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
ELCEN Bucharest District heating

Editor’s Recommendations

main event image
Current Affairs
Yesterday 20:38

A commercial ship caught fire in the Black Sea. Nicușor Dan: It was hit and seems to have sunk.

Sources
imagine sursa
imagine sursa
imagine sursa
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol