The Cluj-Napoca Local Council recently approved compensation of 3.4 million lei for the expropriations related to the construction of the Oașului-Muncii underground passage. The updated value of the compensation is estimated at 670,000 euros, and the project will enter the phase of obtaining the building permit and bidding. Modifications made to the feasibility study have led to an increase in the site area from 18,062 sqm to 18,253 sqm. The compensation will be covered by the local budget, and affected owners will receive the compensation within 30 days. The project, with a total value of approximately 26 million euros, will reconfigure the intersection of Bulevardul Muncii with Oașului Street, aiming to streamline traffic and improve public transport infrastructure.
Latest News
22:06
Air traffic controllers in Norway have gone on strike, causing the cancellation of dozens of flights. The Ministry of Foreign Affairs warns Romanian citizens to check their flights.
21:54
Romania has sent the rescEU Black Hawk helicopter to support Serbia in combating the wildfires that have affected 3,500 hectares.
21:39
Unprecedented lows on the Jiu River. Hydrologists announce a historic minimum at the hydrometric stations in Filiași and Răcari.
21:22
A fragment of a drone was found near the southern dam of the Midia Port and recovered by military divers. The Ministry of National Defense confirmed that it does not present explosive charges.
21:02
The Kremlin dismissed speculation about a meeting between President Vladimir Putin and rapper Kanye West
See more news