search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
147 new news items in the last 24 hours
  1. Home
  2. Current Affairs

The National Road Investment Company is taking over a road project linking the Bucharest North Ring Road to Terminal 2 of Henri Coandă Airport, estimated at 400 million lei.

Andreea Lificiu
whatsapp
facebook
linkedin
x
copy-link copy-link
24 June 2025, 13:33
main event image
Current Affairs
https://www.shutterstock.com/
google-preference

Always see our news on Google

CNIR will build a modern road, 2.5 kilometers long, with two lanes in each direction, which will connect the Bucharest North A0 Ring Road with the future Terminal 2 of Henri Coandă International Airport. The project, which includes a feasibility study and technical design, will also facilitate the connection with County Road 200 B Tunari-A0-Balotești. After taking over the documentation, CNIR will launch the tender for the execution of the works.

Sources

sursa imagine
Profit.ro
CNIR preia proiectul drumului de legătură între Autostrada de Centură București Nord A0 și viitorul Terminal 2 al Aeroportului Otopeni
sursa imagine
Profit.ro
CNIR preia proiectul drumului de legătură între Autostrada de Centură București Nord A0 și viitorul Terminal 2 al Aeroportului Otopeni
sursa imagine
Economica
CNIR preia proiectul Drumului de Legătură între Autostrada A0 București și viitorul Terminal 2 al Aeroportului Otopeni - Economica.net
sursa imagine
News.ro
Compania Naţională de Investiţii Rutiere preia proiectul drumului de legătură între Autostrada de Centură Bucureşti Nord A0 şi viitorul Terminal 2 al Aeroportului Otopeni
sursa imagine
Economedia
CNIR preia proiectul Drumului de Legătură între Autostrada A0 București și viitorul Terminal 2 al Aeroportului Otopeni / Traseul are 2,5 kilometri

Latest News

21:44

MFA warns / Traffic restrictions will be imposed on the Friendship Bridge

21:39

Danish Prime Minister Mette Frederiksen criticizes the discussions held by the President of Finland and the Prime Minister of Norway with Vladimir Putin: “Europe must remain united”

21:30

Luca Niculescu and Maia Sandu discussed the security of the Republic of Moldova / “The future of the Republic of Moldova is in the European family!”

21:13

Eurozone banks tighten lending standards for companies as demand for home loans falls sharply

21:00

HIMERA and GomSpace have launched OBRIA NANO, the first test satellite for the future independent Ukrainian communications network

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
CNAIR announces that traffic on 13 kilometers of A0 North could open by the end of the month
event image
Current Affairs
CNIR is analyzing seven route options for the Bucharest–Giurgiu Motorway
event image
Current Affairs
CNAIR has signed the contract for the reinforcement of the Călimănești Beltway / Traffic will be affected by restrictions
event image
Current Affairs
A0 North: Traffic will open between Afumați and A2 on October 26
event image
Current Affairs
The CNIR approved the Technical Project for section 1D Joseni-Ditrău of the A8 Highway, and the works will begin on August 17, 2026.
event image
Current Affairs
The opening of 13 kilometers of the A0 North, postponed. Exchange of accusations between CNAIR and former Secretary of State Horațiu Cosma
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
CNIR road project Bucharest Ring Road

Editor’s Recommendations

main event image
Exclusive
7 hours ago

EXCLUSIVE Ranking of countries in relevant online sources in Romania: the US, Russia, and Ukraine lead the foreign agenda. Security dominates the conversation

main event image
Exclusive
11 hours ago

ANALYSIS Three empires, one target: how the US, Russia, and China are testing the cohesion of the European Union

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol