search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
123 new news items in the last 24 hours
  1. Home
  2. Current Affairs

A malfunction at CET Sud has left residents of sectors 2, 3, 4, and 5 of the Capital without hot water and heating, with repairs estimated to be completed by January 7.

Radu Burcă
whatsapp
facebook
linkedin
x
copy-link copy-link
4 January 2026, 11:43
main event image
Current Affairs
Foto: pexels
google-preference

Always see our news on Google

On Sunday morning, a new malfunction occurred at CET Sud, affecting the supply of hot water and heating for over 1,000 apartment blocks in sectors 2, 3, 4, and 5 of Bucharest, including areas such as Pantelimon and B-dul Basarabia. ELCEN announced that the malfunction was caused by a boiler-turbine, with the temperature of the thermal agent 8 degrees Celsius below normal. The repair is estimated for January 7, followed by a 24-hour period to restore normal parameters. The old equipment, some from the '60s-'70s, has not been modernized due to underfunding, and Termoenergetica's debt to ELCEN amounts to approximately 1.5 billion lei. ELCEN emphasizes the importance of investments in modernizing power plants to prevent major malfunctions. Additionally, the lack of additional production sources has increased the pressure on CET Bucharest Sud in the event of a technical incident.

Sources

sursa imagine
Hot News
Avarie majoră la sistemul de termoficare din București. Peste 1.000 de blocuri, fără apă caldă și căldură – hartă
sursa imagine
Antena3
Avarie majoră în București: Sunt blocuri rămase fără apă caldă și căldură în 4 sectoare din 6. Când se reia furnizarea agentului termic
sursa imagine
Romania TV
Avarie în Capitală. Furnizarea căldurii și apei calde, afectată în mai multe sectoare. LISTA blocurilor afectate
sursa imagine
Economica
Avarie la CET Sud. Apa caldă și căldura, deficitare în patru sectoare din Capitală
sursa imagine
B365
Termo ALERT | O avarie s-a produs, de dimineață, la CET Sud. Peste 1.400 de blocuri din București primesc greu apă caldă și căldură
sursa imagine
Newsweek
Bucureștenii din mai multe sectoare rămân fără apă caldă și căldură. Avarie la CET Sud

Latest News

19:34

EU General Court finds that the Commission failed to update its timetable for phasing out farm cages

19:18

Ciprian Ciucu on merging Bucharest with Ilfov: “The thought scares me”

19:00

Marcel Ciolacu says the truth about the annulment of the presidential election must be uncovered, although he has not read the AUR report

18:40

Craiova Christmas Market took first place in a European ranking after receiving nearly two million votes

18:23

MADR proposes capping food markups until June 2027 and licensing imports from Ukraine until the end of 2027

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Due to the shutdown of CET Sud, 1,395 blocks in Bucharest have inadequate hot water, especially affecting the Titan neighborhood.
event image
Current Affairs
Termoenergetica announces gradual improvements in the supply of heating and hot water in Bucharest, following the restart of CET București Vest
event image
Current Affairs
Termoenergetica begins work in Sectors 4 and 5, and over 1000 apartment blocks will temporarily be without hot water
event image
Current Affairs
Ciprian Ciucu warns that Bucharest residents could face problems with hot water and heating this winter
event image
Current Affairs
ELCEN additionally supplies 1,860 tons of hot water per hour to cover losses in the Termoenergetica network
event image
Current Affairs
Termoenergetica announces that 71% of associations in Bucharest have hot water and heating supplied at appropriate levels
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
CET South ELCEN Bucharest without hot water Pantelimon Bd. Basarabia Crash Sector 4 Sector 3 Sector 2 sector 5

Editor’s Recommendations

main event image
Economy
7 hours ago

The head of the CNPP announces that pensions will increase from January 1, but the percentage depends on calculations by the Ministry of Finance

Sources
imagine sursa
imagine sursa
main event image
Exclusive
8 hours ago

EXCLUSIVE Ranking of countries in relevant online sources in Romania: Ukraine and Russia dominate the foreign affairs agenda. China gains visibility through the summit in Shenzhen

main event image
International
4 hours ago

ANALYSIS Spain on the verge of a first: the traditional right and the far right close to a joint majority in the November 29 elections / How the Spanish election could affect Romania

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol