search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
158 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Traffic on the A1, the entrance to Bucharest, will be closed for a month for repairs, while work on the A0 North highway has exceeded 70%.

Ana Maria Eftene
whatsapp
facebook
linkedin
x
copy-link copy-link
13 August 2025, 11:22
main event image
Current Affairs
Foto: Pexels.com
google-preference

Always see our news on Google

Between August 11 and September 8, 2025, traffic on the A1 highway entering Bucharest will be closed for repair works at the Ciorogârla overpass. Traffic will be diverted to the other direction with two lanes. In parallel, work on Lot 4 of the A0 North highway, part of the capital's ring road, has exceeded 70% of planned progress. The A0 highway will have a total length of 100 km and will connect with the A1, A2 and A3.

Sources

sursa imagine
psnews.ro
Circulația pe autostrada A1 București – Pitești va fi închisă timp de o lună, în dreptul pasajului Ciorogârla
sursa imagine
Ziare.com
Circulația pe autostrada A1 București - Pitești va fi închisă timp de o lună, pe sensul de intrare
sursa imagine
Economedia
Autostrada A1 București - Pitești. CNAIR închide circulația, timp de o lună, în dreptul pasajului Ciorogârla, pe sensul de intrare în Capitală, pentru reparații

Latest News

10:46

Disney lays off approximately 300 employees in a new round of staff reductions

10:45

Dominic Fritz concludes his term as mayor of Timișoara today. Who will take over the responsibilities

10:44

NIS: Permits for residential buildings fell 12.2% in the first eight months, although they rose slightly in August compared with July

10:33

Traian Băsescu criticizes the “spectacle” surrounding Călin Georgescu’s arrest: “He is not the kind of person who would attack someone”

10:28

North Korea rejects Seoul's accusations regarding the mines that injured three soldiers and threatens retaliation at the border

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Traffic restrictions on DN7, at the overpass on A0, for the installation of the last beams
event image
Current Affairs
On A1, in the Pitești-Bucharest direction, traffic is flowing on a single lane for 6 kilometers. There are also restrictions on A3, between Câmpia Turzii and Nădășelu.
event image
Current Affairs
CNAIR: Traffic on the 16 kilometers of the A7 Highway, the bypass of Bacău, is temporarily closed for connection / Traffic will be diverted through the town
event image
Current Affairs
The Infotrafic Center is closing traffic on the A3 between Nușfalău and Suplacu de Barcău for motorway construction works
event image
Current Affairs
CNAIR explains the reasons why traffic on A10 was not diverted to the opposite direction
event image
Current Affairs
CNAIR closes traffic on the A3 for connection works with the new section toward Chiribiș
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
highway a1 repairs restrictions

Editor’s Recommendations

main event image
Politics
3 hours ago

The Mureșan Government is going to Parliament today for the investiture vote / It needs 233 votes to be invested

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
main event image
Politics
33 minutes ago

Kelemen Hunor, statement before the investiture vote: “If we take into account the statements made by all the leaders in Parliament, there are not 233 votes needed to invest the Government”

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
main event image
Politics
3 hours ago

CCR, expected to make two difficult decisions on the very day of the confidence vote for the Mureșan Government: Sorin Grindeanu’s referral concerning the SAFE ordinance and the resolution of the legal conflict between the Government and the High Court of Cassation and Justice

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+5
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol