search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
126 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Traffic on the A1, the entrance to Bucharest, will be closed for a month for repairs, while work on the A0 North highway has exceeded 70%.

Ana Maria Eftene
whatsapp
facebook
linkedin
x
copy-link copy-link
13 August 2025, 11:22
main event image
Current Affairs
Foto: Pexels.com
google-preference

Always see our news on Google

Between August 11 and September 8, 2025, traffic on the A1 highway entering Bucharest will be closed for repair works at the Ciorogârla overpass. Traffic will be diverted to the other direction with two lanes. In parallel, work on Lot 4 of the A0 North highway, part of the capital's ring road, has exceeded 70% of planned progress. The A0 highway will have a total length of 100 km and will connect with the A1, A2 and A3.

Sources

sursa imagine
psnews.ro
Circulația pe autostrada A1 București – Pitești va fi închisă timp de o lună, în dreptul pasajului Ciorogârla
sursa imagine
Ziare.com
Circulația pe autostrada A1 București - Pitești va fi închisă timp de o lună, pe sensul de intrare
sursa imagine
Economedia
Autostrada A1 București - Pitești. CNAIR închide circulația, timp de o lună, în dreptul pasajului Ciorogârla, pe sensul de intrare în Capitală, pentru reparații

Latest News

15:17

A man from Cluj built his own speed limiter on the street where he lives.

15:06

The toll of the earthquakes in Venezuela has reached 6,438 deaths. 190 buildings have collapsed.

15:02

DOC / Why do thousands of Romanians choose Belgian citizenship annually, even though they have the right to work as EU members?

15:01

A 58-year-old Romanian was found dead in the passage of a train station in Rome.

14:58

Hillary Clinton contests President Trump's foreign policy, stating that it favors North Korea and Russia to the detriment of traditional allies such as Canada and Oman.

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Traffic restrictions on DN7, at the overpass on A0, for the installation of the last beams
event image
Current Affairs
On A1, in the Pitești-Bucharest direction, traffic is flowing on a single lane for 6 kilometers. There are also restrictions on A3, between Câmpia Turzii and Nădășelu.
event image
Current Affairs
The works on A0 North, lot 1 (Joița-Corbeanca), have reached a physical stage of 63%
event image
Current Affairs
CNAIR: Traffic on the 16 kilometers of the A7 Highway, the bypass of Bacău, is temporarily closed for connection / Traffic will be diverted through the town
event image
Current Affairs
Lot 4 Pantelimon – Glina of the A0 North highway is almost completed, but it cannot be opened to traffic.
event image
Current Affairs
The A1 motorway is temporarily closed in Hunedoara: traffic diverted before the reception of Lot 3 Lugoj–Deva
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
highway a1 repairs restrictions

Editor’s Recommendations

main event image
Politics
4 hours ago

Race against the clock for the billions from the PNRR. Thousands of PNRR projects must be completed in Romania in a maximum of two weeks.

Sources
imagine sursa
imagine sursa
imagine sursa
main event image
Exclusive
22 minutes ago

DOC / Why do thousands of Romanians choose Belgian citizenship annually, even though they have the right to work as EU members?

main event image
Politics
2 hours ago

Radu Miruță accuses PSD of having closed coal production capacities at the Oltenia Energy Complex, and now "pretends to be surprised that it is closed": "They haven't lifted a finger".

Sources
imagine sursa
imagine sursa
imagine sursa
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol