search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
81 new news items in the last 24 hours
  1. Home
  2. Current Affairs

The bridge over the Danube at Brăila is deteriorating, with subsidence at the access ramp. Traffic restrictions have been imposed due to structural issues.

Liviu Brăteanu
whatsapp
facebook
linkedin
x
copy-link copy-link
3 February 2026, 15:09
main event image
Current Affairs
Foto: Pixabay
google-preference

Always see our news on Google

The bridge over the Danube at Brăila, known as the Golden Gate of Romania, is facing serious degradation issues less than three years after its inauguration. Settlements have reappeared at the access ramp on the Brăila bank, affecting traffic, especially heavy vehicles. The first settlements were observed in the autumn of 2024, and the contractor attempted to remedy them in the spring of 2025 through deep drilling and the introduction of metal pillars. However, the settlements returned, prompting authorities to impose traffic restrictions, limiting speed to 40 km/h.


The National Company for Road Infrastructure Administration has confirmed that the work is under warranty, and the costs of the repairs will be borne by the contractor. Over time, several resurfacing works have been carried out, and structural issues have been discovered, such as loose bolts and infiltrations. Traffic restrictions are in effect indefinitely until the problems are resolved.

Sources

sursa imagine
Observator news
Restricții de circulație pe podul peste Dunăre de la Brăila din cauza tasărilor apărute sub o rampă de acces
sursa imagine
Libertatea
Restricții de circulație pe podul suspendat de peste Dunăre: șoferii trebuie să reducă viteza pe ambele sensuri

Latest News

12:53

OpenAI estimates a negative cash flow of 278 billion dollars by 2030, amid massive investments in AI infrastructure

12:29

A man from Suceava who stabbed his mother in the neck was detained/ The victim hid in a cornfield

12:25

National Rally leaders Marine Le Pen and Jordan Bardella condemn Russia for hybrid attacks and pressure on France

12:13

Ed Sheeran, at the concert in Philadelphia, after the Macklemore controversy and calls for a boycott: “What is happening in Gaza is catastrophic, unjustifiable, and disproportionate”

12:03

Ploiești PSD calls for the rainbow paint to be removed from the statue of Mr. Goe, which was painted as part of an urban art project

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
The stage of the works on the Express Road Brăila - Galați has exceeded 97%
event image
Current Affairs
Rail traffic on the Danube Bridge between Bulgaria and Romania will be completely suspended between April 5 and December 13, 2027, due to electrification works and the restoration of the railway infrastructure.
event image
Current Affairs
Cracks on Highway 10 Sebeș-Turda: Restricted traffic and consolidation works
event image
Current Affairs
Traffic restrictions on DN7, at the overpass on A0, for the installation of the last beams
event image
Current Affairs
CNAIR explains the reasons why traffic on A10 was not diverted to the opposite direction
event image
Current Affairs
Irinel Ionel Scrioșteanu announces the installation of the last element of the bridge over the Siret on the Braila-Galati Expressway, which will be opened to traffic by the end of the year.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Brăila Bridge traffic restrictions Danube

Editor’s Recommendations

main event image
International
4 hours ago

Germany votes in two states / AfD may make further gains, putting Chancellor Friedrich Merz under pressure

Sources
imagine sursa
imagine sursa
imagine sursa
main event image
International
5 hours ago

Russia votes on the final day of parliamentary elections, in a ballot dominated by Vladimir Putin’s party

Sources
imagine sursa
imagine sursa
main event image
Politics
4 hours ago

Siegfried Mureșan delivers a firm message after being nominated prime minister: “We will keep the light on”

Sources
imagine sursa
imagine sursa
imagine sursa
main event image
Opinions
5 hours ago

Sever Voinescu: A Thought for Romanian Education

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol