search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
70 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Termoenergetica Bucharest has begun testing the winter heating system / Tests are conducted at night, progressively, depending on the condition of the network

Cristiana Dida
whatsapp
facebook
linkedin
x
copy-link copy-link
17 October 2026, 09:59
main event image
Current Affairs
Foto: shutterstock.com
google-preference

Always see our news on Google

Termoenergetica Bucharest has progressively begun heating tests for the cold season, as the district heating system is extensive and the pipeline network is aging and undergoing modernization.

The tests are carried out at night, when temperatures in the capital are lower, and are intended to balance the installations and check the system’s operation. The pace of testing is adjusted according to existing breakdowns, work being carried out in various areas, and the condition of the pipelines.

Modernization work will continue during the cold season, but only in areas where temporary replacement systems are available. These replacement pipelines allow interventions on the underground network without interrupting the supply of heating to residents.

Termoenergetica is asking homeowners’ associations to check their internal installations, complete work in their buildings, and ensure that radiators have been bled. Associations that wish to postpone the heating supply may submit a request.

The start of heating is not set by a fixed date. According to the law, the supply of heating begins when the outside temperature is no higher than 10 degrees Celsius for three consecutive nights, between 8:00 p.m. and 6:00 a.m.

Sources

sursa imagine
Digi24
Au început probele la căldură pentru iarnă. Ce se întâmplă cu lucrările de modernizare și când se dă drumul la căldură
sursa imagine
EVZ.ro
Termoenergetica a început probele pentru căldură

Latest News

23:51

Newsrooms in several European countries were evacuated after receiving false threats

23:16

Israel’s president designated opposition leader Gadi Eisenkot as prime minister

22:31

EIB survey: 80% of respondents in Romania say that more expensive energy has significantly reduced their purchasing power, while 55% have cut spending on food or healthcare

22:22

EPPO announces 13 arrests in an investigation into an alleged €100 million VAT fraud involving luxury cars

22:11

Volodymyr Zelenskyy expresses solidarity with Poland after the shooting attack in Kraków

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Termoenergetica begins hot-water system testing in Bucharest, amid a weather forecast indicating falling temperatures
event image
Current Affairs
Termoenergetica begins filling the systems with water and conducting pressure tests on Thursday to prepare for the cold season
event image
Current Affairs
Termoenergetica announces that 71% of associations in Bucharest have hot water and heating supplied at appropriate levels
event image
Current Affairs
Termoenergetica begins work in Sectors 4 and 5, and over 1000 apartment blocks will temporarily be without hot water
event image
Current Affairs
Ciprian Ciucu warns that Bucharest residents could face problems with hot water and heating this winter
event image
Current Affairs
The General Mayor of the Capital, Ciprian Ciucu, announced that he would send the Control Corps to Termoenergetica after allegedly receiving information from the company’s employees that both very hot and cold water are being introduced into the same pipe.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
thermal agent Termoenergetica Bucharest homeowners' associations district heating system Thermoenergy probe Heat

Editor’s Recommendations

main event image
Opinions
Yesterday 20:01

Sever Voinescu: Merit, Privilege, Responsibility—Total Loss

main event image
International
Yesterday 21:16

Israel’s president designated opposition leader Gadi Eisenkot as prime minister

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+2
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol