search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
51 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Metrorex announced the completion of a tunnel segment at the Băneasa station, advancing the works on Line 6, which will connect the North Station to Otopeni Airport.

Liviu Brăteanu
whatsapp
facebook
linkedin
x
copy-link copy-link
20 January 2026, 18:06
main event image
Current Affairs
foto: Facebook/ Metrorex
google-preference

Always see our news on Google

Metrorex announced that the tunneling shield 'Sfânta Maria' has broken through the wall of the future metro station Gara Băneasa, marking the completion of the second segment of the tunnel on Line 6. The shield 'Sfânta Ana' is also heading towards the same destination, having already covered 1,600 meters and assembled 1,076 tunnel rings.


The tunnel excavated by 'Sfânta Maria' between the Tokyo and Gara Băneasa stations totals 2,006 meters and 1,334 rings. The total length of the underground tunnel up to the 1 Mai station will be 6.6 km. The works are in accordance with the execution planning for the SOUTH Section of Line 6, which will connect Gara de Nord to Otopeni International Airport, having a route of 14.2 km and 12 stations.

Sources

sursa imagine
Digi24
Metrorex a anunţat că scutul de forare „Sfânta Maria” a ajuns la Gara Băneasa. Tunelul realizat până acum a trecut de 2km
sursa imagine
Antena3
Scutul de forare „Sfânta Maria” a ajuns la stația de metrou Gara Băneasa. Stadiul lucrărilor la Magistrala 6
sursa imagine
News.ro
Metrorex anunţă că scutul de forare "Sfânta Maria" a ajuns la Gara Băneasa / Tunelul realizat până acum însumează 2006 metri excavaţi şi 1.334 inele de tunel asamblate / În ce stadiu este al doilea utilaj - FOTO

Latest News

14:43

Alexandru Rogobete: “Romania’s pharmaceutical market has begun to become increasingly controlled by the major pharmacy chains”

14:15

ELCEN has restarted the Bucharest West CHP Plant and reconnected the plant to the National Energy System

14:02

Dacian Cioloș and the race for the leadership of the International Organisation of La Francophonie: the stakes for Romania and its role as a balancing factor

13:56

Prime Minister Luca Niculescu condemns drone attacks on commercial vessels and announces measures to ensure security in the Black Sea

13:35

The Minister of Defense announced that he will request air patrols and anti-drone equipment in Brussels following the attacks on ships in the Black Sea

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Metrorex restricts traffic on DN1 / The Otopeni–Bucharest direction will have two lanes for 10 days
event image
Current Affairs
Bucharest City Hall and Sector 6 are preparing to extend the Ciurel Overpass to the Bucharest Ring Road
event image
Current Affairs
CNAIR announces that traffic on 13 kilometers of A0 North could open by the end of the month
event image
Current Affairs
CNAIR announces the completion of excavation for both bores of the Boița 1 Tunnel on the Boița-Cornetu section of the Sibiu-Pitești Motorway
event image
Current Affairs
Sector 5 City Hall has signed the contract for the feasibility study for the M7 Bragadiru–Voluntari metro line
event image
Current Affairs
Bucharest City Hall is accelerating 12 major infrastructure projects in 2026
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Metrorex bus 6 subway

Editor’s Recommendations

main event image
Current Affairs
1 hour ago

Dacian Cioloș and the race for the leadership of the International Organisation of La Francophonie: the stakes for Romania and its role as a balancing factor

main event image
International
3 hours ago

Bloomberg: The Pentagon is reviewing the plan to withdraw troops from Europe, from 25,000 to approximately 5,000 soldiers

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
main event image
Current Affairs
1 hour ago

The Minister of Defense announced that he will request air patrols and anti-drone equipment in Brussels following the attacks on ships in the Black Sea

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+2
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol