Always see our news on Google
Bucharest Airports National Company (CNAB) will modernize the checked baggage processing system in the North Departures area of Bucharest Henri Coandă International Airport through an investment estimated at €36.8 million, financed from its own funds. The project includes design, construction, operation, maintenance, and repairs during the warranty and post-warranty periods.
The system will be fully modernized by integrating hardware and software equipment for the transport, scanning, inspection, and security screening of baggage. The objective is to increase processing capacity, reduce operating times, and improve the reliability of services provided to passengers.
The works will take no more than one year and eight months and will be carried out in stages so that the airport can maintain its operations. During the interventions, several check-in desks will be able to operate continuously, while the system will ensure at least 50% of the existing processing capacity.
Throughout the works in the North Departures area, the system in the South Departures area will operate continuously at full capacity. Baggage is handed in at the check-in desks, scanned, transported on conveyor belts in the basement area, and subjected to automated checks before being directed to the aircraft.
,Sources
Latest News
12:56
12:47
12:46
12:33
12:29
See more news