search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
130 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Sector 5 City Hall has signed the contract for the feasibility study for the M7 Bragadiru–Voluntari metro line

Raluca Ioana Draghici
whatsapp
facebook
linkedin
x
copy-link copy-link
23 September 2026, 19:48
main event image
Current Affairs
Shutterstock
google-preference

Always see our news on Google

The Sector 5 City Hall signed on Wednesday the contract for preparing the feasibility study for the M7 Bragadiru–Voluntari metro line, a project estimated at approximately 26 kilometers and 27 stations. The documentation will establish the final route, the number of stations, and the technical solutions required to build the line.

The contract was signed by Sector 5, the partnership leader for preparing the metro line, in collaboration with Metrorex, the Ministry of Transport and Infrastructure, the Ilfov County Council, and Sector 2. The study will be prepared by the companies Concrete Design Solutions and Urban Scope, while the funding is secured through European funds under the Transport Programme 2021–2027.

The metro line is expected to connect the city of Bragadiru with Voluntari, crossing Sector 5, the central area of Bucharest, and Sector 2. The route targets a corridor where hundreds of thousands of Bucharest and Ilfov residents live and work, but which currently lacks high-capacity public transport.

The signing of the contract marks the transition from strategic planning to the technical preparation of the project.

The partnership between the local authorities and the central administration was established through a protocol signed in 2025.

Sources

sursa imagine
Digi24
Încă un pas pentru construcția magistralei de metrou M7 Bragadiru - Voluntari: Contractul pentru studiul de fezabilitate a fost semnat
sursa imagine
B365
Magistrala M7: contractul pentru studiul de fezabilitate a fost semnat. Metroul Bragadiru – Voluntari va lega sud-vestul de nord-estul regiunii București-Ilfov
sursa imagine
Stiripesurse
Primarul Sectorului 5 a semnat contractul - Pas decisiv pentru Magistrala de metrou M7 Bragadiru-Voluntari
sursa imagine
Agerpres
Sector 5: Vlad Popescu Piedone a semnat contractul pentru studiul de fezabilitate al magistralei de metrou Bragadiru - Voluntari
sursa imagine
G4Media
Primăria Sectorului 5 a semnat contractul pentru studiul de fezabilitate al magistralei de metrou Bragadiru - Voluntari (M7)
sursa imagine
Economica
O nouă linie de metrou va fi construită în București. S-a semnat contractul pentru studiul de fezabilitate al Magistralei M7
sursa imagine
Ziare.com
Primarul Sectorului 5 a semnat contractul pentru studiul de fezabilitate al liniei de metrou M7 Bragadiru - Voluntari. Traseul va avea 26 de kilometri și 27 de stații
sursa imagine
Profit.ro
ANUNȚ FOTO Vom avea o nouă linie de metrou, cu 27 de stații HARTĂ
sursa imagine
Economedia
O nouă linie de metrou în București. Primăria Sectorului 5 a semnat contractul pentru studiul de fezabilitate al magistralei Bragadiru - Voluntari (M7)

Latest News

19:30

Energy Minister Dumitru Chisăliță is preparing to extend the gas price cap and introduce new measures for vulnerable consumers

19:23

Italian authorities evacuated hundreds of students after a bomb alert was sent to 271 schools

19:23

Sanitas calls on the labor minister for salary increases in 2027 and genuine negotiations on the new pay law

19:17

IMM România proposes the “Resilient SME Energy” program, with funding of up to 500,000 euros for companies

19:14

Wiz Khalifa’s nine-month prison sentence annulled / Case to be retried in Bucharest

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Cluj-Napoca City Hall signed the contract for Metro Line I, with a total value of approximately 2 billion euros
event image
Current Affairs
The Bucharest City Hall has approved the construction of the Petricani Passage
event image
Current Affairs
Metrorex is purchasing 128.81 million new magnetic and contactless cards under a contract worth nearly RON 25 million
event image
Current Affairs
Bucharest City Hall and Sector 6 are preparing to extend the Ciurel Overpass to the Bucharest Ring Road
event image
Current Affairs
Metrorex restricts traffic on DN1 / The Otopeni–Bucharest direction will have two lanes for 10 days
event image
Current Affairs
Ciprian Ciucu announced the start of the installation works for the tram line under the Constanța Bridge, with an estimated completion in three weeks.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Metrorex Bucharest City Hall of Sector 5 Ministry of Transport M7 main line

Editor’s Recommendations

main event image
INSCOP Surveys
9 hours ago

New Money-INSCOP Entrepreneurs' Barometer - 3rd Edition, November 2026 / 75.4% of entrepreneurs believe that Romania is heading in the wrong direction

main event image
International
7 hours ago

SUMMARY / America votes, Trump plays out the final 2 years of his term. The midterm elections and the discontent threatening the Republican majority in Congress

main event image
Diaspora
6 hours ago

Alice Weidel accuses Romanian migrants of putting pressure on the German social welfare system. The figures cited by the AfD leader

Sources
imagine sursa
imagine sursa
main event image
Politics
3 hours ago

Dominic Fritz responds to Alice Weidel after she accused Romanian migrants

Sources
imagine sursa
imagine sursa
imagine sursa
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol