search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
60 new news items in the last 24 hours
  1. Home
  2. Current Affairs

The Ministry of Environment has issued the environmental permit for the completion of works at the Cornetu-Avrig hydroelectric power plant / The investment is estimated to produce 156.8 GWh annually

Raluca Ioana Draghici
whatsapp
facebook
linkedin
x
copy-link copy-link
21 September 2026, 16:36
main event image
Current Affairs
Foto: mmediu.ro
google-preference

Always see our news on Google

On September 21, the Ministry of Environment issued environmental approval for the completion of works related to the hydropower development on the Olt River, carried out by Hidroelectrica. The investment is estimated to generate 156.8 GWh of renewable energy annually, equivalent to the consumption of more than 52,000 households.

The project concerns works begun under the plan approved in 1989, which comprises five hydropower stages: Cornetu, Robești, Câineni, Lotrioara and Racovița. The approval provides for the completion of the Câineni and Lotrioara stages, as well as interventions at the Racovița development.

The technical solution takes into account the existing infrastructure in the Olt Gorge and seeks, wherever possible, to preserve the current sites of the railway and DN7 national road. At Racovița, works are planned to protect the railway bridges and remove the weir downstream from the power plant, allowing it to operate at its designed parameters.

The assessment included the environmental impact report, the appropriate assessment study and an analysis of the impact on water bodies. The approval establishes measures to mitigate environmental effects and monitoring obligations throughout the works and during the operational phase.

The procedure included public consultation and debates held in Câineni and Boița. Four submissions containing comments were received, from three individuals and one legal entity. The document also includes the conditions set by the Ministry of Culture for the protection of the historic monument known as the Spart Tower.

Sources

sursa imagine
Mediafax
Ministerul Mediului a emis acordul de mediu pentru finalizarea hidrocentralei Cornetu-Avrig
sursa imagine
G4Media
Amenajarea hidroenergetică Cornetu-Avrig are undă verde pentru a fi finalizată

Latest News

11:58

The Minister of Labor and Social Protection of the Republic of Moldova apologizes for the statement about large houses and explains the 350-cubic-meter threshold for compensation

11:43

Allen Coliban was designated the USR candidate for the Brașov City Hall in 2028. Flavia Boghiu wished him success and announced that she would remain in the party

11:20

Petișor Peiu attacks Nicușor Dan / The AUR senator accuses him of poor governance and authoritarian excesses

11:10

COP31: The new draft climate decision does not mention fossil fuels, but calls for electrification

11:00

ANM issues warnings of blizzards, snowfall, and strong winds in several regions

See more news

NEWS ON THE SAME TOPICS

event image
Economy
Hidroelectrica is preparing the approval of the construction of a floating photovoltaic panel system on the Olt River, an investment of 1.4 billion lei
event image
Current Affairs
The Electrica Group has signed the contract for the construction of a cogeneration plant in Craiova, which will provide thermal and electric energy.
event image
Economy
Hidroelectrica Raises Electricity Prices / How Much Household Customers’ Bills Will Increase
event image
Economy
Hidroelectrica is investing RON 296.8 million in a 64 MW battery storage system at Iron Gates II
event image
Current Affairs
Craiova invests in cogeneration: new natural gas power plant
event image
Current Affairs
Two new power plants have entered the National Energy System. The units in Constanța and Arad will operate this winter.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
hidroelectrica Ministry of Environment olt hydropower project Infrastructure renewable energy renewable energy

Editor’s Recommendations

main event image
Opinions
Yesterday 19:08

Sever Voinescu: The Misadventures of a Press Conference

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol