search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
54 new news items in the last 24 hours
  1. Home
  2. Current Affairs

The Electrica Group has signed the contract for the construction of a cogeneration plant in Craiova, which will provide thermal and electric energy.

Ana Maria Eftene
whatsapp
facebook
linkedin
x
copy-link copy-link
24 August 2026, 15:45
main event image
Current Affairs
Foto: Facebook / Lia Olguta Vasilescu
google-preference

Always see our news on Google

The Electrica Group signed on Monday the contract for the development of a high-efficiency cogeneration plant in Craiova, which will use thermal engines powered by natural gas.


This plant will provide thermal energy for the centralized system of the municipality and electricity to the National Energy System. The project, designed as a flexible unit ready for hydrogen, will replace a coal-based source, reducing emissions and pollution.

With an installed electric power of 82 MW and a thermal capacity of 179 Gcal/h, the plant will also include thermal energy storage capacity. The engines will operate on natural gas, with the possibility of using hydrogen as it becomes available.

The project will be carried out in two phases, ensuring efficient production of electricity and thermal energy.

Sources

sursa imagine
Agerpres
Electrica va dezvolta la Craiova o centrală de cogenerare de înaltă eficiență, hydrogen-ready și cu capacitate de black-start
sursa imagine
G4Media
Electrica va dezvolta la Craiova o centrală de cogenerare de înaltă eficienţă
sursa imagine
News.ro
Centrală de cogenerare de înaltă eficienţă, hydrogen-ready şi cu capacitate de black-start, dezvoltată de Electrica la Craiova. Putere electrică instalată de circa 82 MW

Latest News

23:03

Macron warns that reducing support for Ukraine would impose an unjust peace and pave the way for a new war

22:34

RO-Alert in Tulcea: The Ministry of National Defence detected a new air target east of Snake Island / Two F-16 aircraft took off

22:16

Health Minister Alexandru Rogobete Calls for Coverage of Reconstruction of Both Breasts After Bilateral Mastectomy

21:55

U.S. Army tests autonomous military robots / Vehicles operate in groups and identify targets without GPS

21:16

Canada and the Philippines have concluded negotiations for a free trade agreement, which could enter into force in 2027

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Craiova invests in cogeneration: new natural gas power plant
event image
Current Affairs
Craiova will build a cogeneration plant worth 235 million euros, which will provide heating for 53,000 homes.
event image
Current Affairs
The shareholders of Electrica have approved an investment project of 235 million euros for the construction of electricity and thermal energy production facilities in Craiova, including for Ford Otosan.
event image
Current Affairs
Two new power plants have entered the National Energy System. The units in Constanța and Arad will operate this winter.
event image
Current Affairs
ELCEN will connect CET Bucharest West to the Transgaz main pipeline / The RON 83.3 million investment could reduce heating costs
event image
Current Affairs
Ilie Bolojan: The thermal power plant in Iernut must be completed by the end of the year.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
electricity cogeneration Craiova

Editor’s Recommendations

main event image
Opinions
13 November 2026, 15:38

Sever Voinescu: Which kind of extremism do you prefer, right-wing or left-wing?

main event image
Exclusive
Yesterday 09:01

SPECIAL "The Efficiency Trap": why Artificial Intelligence promises us free time, but brings us more work and burnout

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol