search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
138 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Craiova invests in cogeneration: new natural gas power plant

Sanziana Georgescu
whatsapp
facebook
linkedin
x
copy-link copy-link
24 August 2026, 17:09
main event image
Current Affairs
Shutterstock
google-preference

Always see our news on Google

The mayor of Craiova, Olguţa Vasilescu, announced the signing of a contract with Electrica for the development of a high-efficiency cogeneration plant, powered by natural gas, which will supply thermal agent in the centralized system of the city.

The project, which will replace the coal source, is scheduled to become operational in the first semester of next year, along with the installation of hot water boilers. The new plant will be flexible, ready for hydrogen use, and will have autonomous startup capacity. The project includes two phases: the first will install the boilers, and the second will activate the cogeneration engines.

This will reduce pollution emissions, improving air quality in Craiova. The total investment amounts to approximately 235 million euros, and the plant will have an electrical power of 82 MW and a thermal capacity of 179 Gcal/h.

The project will allow the City Hall to collaborate with a new partner for thermal energy production, in accordance with European regulations.

Sources

sursa imagine
Digi24
Primarul Craiovei anunţă că va înlocui sursa pe cărbune a termoficării din oraş cu o centrală de cogenerare
sursa imagine
Agerpres
Dolj: Primarul Craiovei anunță că va înlocui sursa pe cărbune a termoficării din oraș cu o centrală de cogenerare

Latest News

08:02

Sorin Grindeanu accuses Ilie Bolojan of leaving a "hole" of 50 billion lei / “We have the highest VAT, we have the highest inflation in Europe, we have 12 consecutive months of decline”

07:46

POLITICO: U.S. postpones announcement on the future of American troops in Europe

07:30

George Simion, controversial statement on the day he became a criminal defendant: “I am more determined than ever to deal with these wretches who think they rule over the country and over us. To skin them as they skinned us”

07:17

The English side had fun with Romania’s champions. Universitatea Craiova “demolished” by Brighton in the Conference League

23:48

Mihai Ghigiu says that George Simion must answer before the law, after the AUR leader became a defendant

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Craiova receives mountain water / Isvarna-Craiova water supply system inaugurated
event image
Current Affairs
ELCEN will connect CET Bucharest West to the Transgaz main pipeline / The RON 83.3 million investment could reduce heating costs
event image
Current Affairs
Ciprian Ciucu promises to connect 20,000 homes to the gas network within three years
event image
Economy
The Government spokesperson announces that Romania will have an energy storage capacity of 2,000 MW by the end of the year
event image
Economy
Transgaz Director: The Mintia Power Plant Begins Commercial Production with the First Turbine, While the Second Enters Testing
event image
Politics
Ilie Bolojan announced the resumption of works at the Iernut power plant, with an estimated completion by the end of 2026.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Craiova Lia Olguța Vasilescu cogeneration central natural gas

Editor’s Recommendations

main event image
Exclusive
Yesterday 14:58

EXCLUSIVE Ranking of companies in relevant online sources in Romania. Nvidia leads the visibility rankings. Dacia brings the automotive industry to the forefront of domestic debate

main event image
Opinions
Yesterday 09:30

Andrei Pleșu: Irritations

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol