search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
146 new news items in the last 24 hours
  1. Home
  2. Current Affairs

The Ministry of the Environment has approved a project for the Vâja dam, ensuring energy development and environmental protection through correct technical solutions.

Cristina Petrache
whatsapp
facebook
linkedin
x
copy-link copy-link
26 January 2026, 14:23
main event image
Current Affairs
Foto facebook.com/ Diana Buzoianu
google-preference

Always see our news on Google

Diana Buzoianu, the Minister of the Environment, announced the approval of the Vâja dam project, emphasizing that this is proof of effective collaboration between institutions and compliance with legal regulations. The decision was made by the Technical Analysis Commission of MMAP, after a detailed evaluation of the environmental impact, based on specialized studies. The project aims to ensure the safety of the dam at the intermediate level of 572 mdM, while simultaneously optimizing hydroelectric energy production and protecting downstream localities from floods. The selected alternative minimizes the impact on the Tismana River, maintaining the connectivity of aquatic ecosystems. Measures for preventing and monitoring environmental impact are integrated into all stages of the project. The Cerna-Motru-Tismana hydrotechnical complex is 90% completed, with an installed capacity of 119 MW.

Sources

sursa imagine
Economica
Noi hidrocentrale în România, 120 MW. S-a dat acordul de mediu
sursa imagine
Profit.ro
Apar noi hidrocentrale în România. OK de mediu pentru Cerna-Motru-Tismana

Latest News

07:38

Donald Trump announces a security pact with Denmark and Greenland / The US will be able to expand its military presence in the Arctic

07:21

Luxembourg Airport temporarily suspended flights after unauthorized drones were detected within the airport perimeter

23:52

JP Morgan acknowledges that it cannot predict the evolution of oil prices amid uncertainty over the war between the US and Iran

23:42

Cuba’s Ministry of Energy announces the collapse of the entire national power grid / It is the seventh total blackout recorded since the beginning of the year

23:12

Donald Trump bans CNN, MSNOW, and Politico from the White House, accusing them of broadcasting fake news

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
The Minister of the Environment, Diana Buzoianu, announced the completion of the rehabilitation works of the Leșu Dam.
event image
Current Affairs
Environmental organizations Agent Green, Bankwatch, and DeClic contest the CCR's decision to allow the construction of hydropower plants in protected areas, warning about the ecological impact.
event image
Current Affairs
The Ministry of Environment allocates 32 million lei for alternative water sources in Prahova County, following the incident at Paltinu.
event image
Current Affairs
Romania and Serbia sign a memorandum for the hydropower project Iron Gates III
event image
Current Affairs
The European Commission confirms that the environmental organization WWF has submitted a complaint regarding the planned project on the Bala branch of the Danube.
event image
Current Affairs
Diana Buzoianu stated that the works at the Bala dam, necessary for preventing the water crisis, had permits and funding from 2024: "What we see now on the Danube is the failure of the last 2-3 years."
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
hydroelectric power plants Ministry of Environment Vâja dam Diana Buzoianu

Editor’s Recommendations

main event image
Opinions
Yesterday 09:30

Andrei Cornea: How AI Will Kill Us

main event image
IT&C knowledge
Yesterday 13:13

DOC Tilcayo, the new wild cat species discovered in the Bolivian Andes

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol