search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
140 new news items in the last 24 hours
  1. Home
  2. Politica
8 minutes ago

Eurowind Energy begins installing turbines for two wind farms in Galați and Constanța

Riana Gegiu
whatsapp
facebook
linkedin
x
copy-link copy-link
26 November 2026, 15:56
main event image
Current Affairs
Foto: Shutterstock.com
google-preference

Always see our news on Google

Eurowind Energy Romania has begun delivering and installing turbines for the Frumușița wind farm in Galați County and the Pecineaga Nord-Est wind farm in Constanța County. The two projects are part of a portfolio of three wind farms that will have a combined 23 turbines and an installed capacity of 138 MW. All are scheduled to become operational in 2027.

The first components of the Vestas V162 turbines arrived at the Frumușița construction site in October, where the installation of tower sections has begun. Deliveries have also started for Pecineaga Nord-Est, with the nacelles, blades and other components due to arrive. For the Vector wind farm, transportation of the main equipment is scheduled for spring 2027.

Frumușița will have 11 turbines and 66 MW, Pecineaga Nord-Est eight turbines and 48 MW, while Vector will have four turbines and 24 MW. The projects are being developed under the Contracts for Difference (CfD) scheme, and equipment maintenance will be provided for 20 years.

Eurowind Energy operates four solar farms and two wind farms in Romania, with a total capacity of 184 MW, including 60 MW of battery storage. The company also has approximately 7.5 GW of projects under development.

-assistant to=event_translation code араион 代 ગયુંjson#+#+#+#+ (json വായ) | 天天中彩票中 天天中彩票网 񟿿 json: invalid? Wait final must pure JSON. Need correct closing. Let's output. t>
Context: Romania is accelerating investments in renewables and storage, with more projects commissioned or financed

Before the installation of the wind turbines began, Romania’s energy sector was supported by ongoing projects: OMV Petrom and Renovatio commissioned three photovoltaic parks (Țăndărei, Bucovăț and Căzănești), with a gross installed capacity of approximately 130 MW, investments of around 78 million euros and estimated production of 0.2 TWh/year.

At the same time, financing and new developments for solar and wind power were announced: Electrica acquired the superficies right for approximately 240 hectares at Liberty Galați, targeting a photovoltaic park of approximately 250 MW and storage facilities of up to 250 MW, while Rezolv Energy received financing of up to 367 million euros for the Dunărea East wind farm (292.5 MW), scheduled to begin operations at the start of 2029.

Sources

sursa imagine
Economedia
Eurowind Energy montează turbine pentru parcuri eoliene de 138 MW
sursa imagine
Financial Intelligence
Eurowind Energy România a început livrarea și montajul turbinelor pentru parcurile eoliene Frumușița și Pecineaga Nord-Est. Urmează Vector.
sursa imagine
Economica
A început montajul turbinelor pentru două parcuri eoliene ale Eurowind în România și urmează și la al treilea. 138 MW noi care vor fi funcționali în 2027

Latest News

17:58

A woman missing from the Republic of Moldova was found in two buried suitcases / Her partner was detained

17:56

CNIR: Work on the Chiribiș-Biharia section of the A3 motorway has reached 90%

17:52

António Costa calls for compromise on the size, priorities and revenues of the EU budget for 2028–2034

17:38

Roberta Metsola warns European leaders of a reduction of more than EUR 46 billion in cohesion funding

17:32

Nicușor Dan estimates that the chances for peace in Ukraine will be greater in spring 2027 and calls for continued pressure on Russia

See more news

NEWS ON THE SAME TOPICS

event image
Economy
Econergy will build a 35 MW wind farm in Tulcea after ANRE approved ECO WIND SĂLBATICA's application
event image
Economy
Rezolv Energy secures financing of up to 367 million euros for the Dunărea East wind farm in Constanța
event image
Economy
OMV Petrom and Renovatio have commissioned three photovoltaic parks that supply energy and can power more than 110,000 households
event image
Economy
Electrica and Liberty Galați plan a 250 MW solar park and battery storage facilities on 240 hectares
event image
Economy
HELLENiQ ENERGY announces investments of more than one billion euros in Romania by 2030 for renewable energy and storage projects
event image
Current Affairs
Transelectrica announces an increase in storage capacity to 1,162 MW, but experts warn about costs passed on to consumers
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Romania Constanta County wind energy Frumușița galati county eurowind energy

Editor’s Recommendations

main event image
Current Affairs
2 hours ago

The government extends the cap on commercial markups for basic food products until June 30, 2027

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+12
main event image
Politics
3 hours ago

Nicușor Dan and Giorgia Meloni, designated to represent the interests of the “Friends of Cohesion” group in negotiations for the 2028–2034 EU budget

Sources
imagine sursa
imagine sursa
imagine sursa
main event image
Current Affairs
4 hours ago

Nicoleta Pauliuc sues the PNL and requests the suspension of the decision that led to her exclusion from the liberal parliamentary group

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+5
main event image
Exclusive
1 hour ago

EXCLUSIVE Ranking of companies in relevant online sources in Romania. Nvidia leads the visibility rankings. Dacia brings the automotive industry to the forefront of domestic debate

main event image
Opinions
6 hours ago

Andrei Pleșu: Irritations

main event image
International
1 hour ago

North Korea temporarily suspends military support for Russia amid a diplomatic conflict between Pyongyang and Moscow

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+2
main event image
International
5 hours ago

Jared Kushner, President Donald Trump’s special envoy for negotiations regarding the war in Ukraine, described Vladimir Putin as “a grand master of politics”

Sources
imagine sursa
imagine sursa
main event image
Exclusive
6 hours ago

EXCLUSIVE Top domestic political topics trending over the past week / AUR dominates the agenda with the report on the annulment of the elections, PNL marked by internal scandals

main event image
Exclusive
7 hours ago
Original Content

November 26, 2026. TV: What was discussed last night on the news channels

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol