search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
169 new news items in the last 24 hours
  1. Home
  2. Economy

Econergy will build a 35 MW wind farm in Tulcea after ANRE approved ECO WIND SĂLBATICA's application

Sanziana Georgescu
whatsapp
facebook
linkedin
x
copy-link copy-link
20 September 2026, 19:48
main event image
Economy
Unsplash
google-preference

Always see our news on Google

ANRE approved, at the latest meeting of the Regulatory Committee, the application submitted by ECO WIND SĂLBATICA S.R.L. for the issuance of an establishment authorization for the CEE Agighiol – Valea Nucarilor wind power plant. The project, with a capacity of 35 MW, is set to be built in Valea Nucarilor, Tulcea County.

The company is controlled by Israel’s Econergy group, one of the most active investors in Romania’s renewable energy sector. The establishment authorization requires, among other things, proof of construction financing, indicating that the project has prospects of being completed and subsequently entering the energy market.

CEE Agighiol – Valea Nucarilor is the first wind project announced by Econergy in Romania. Until now, the group has focused on photovoltaic parks and storage systems.

About a month ago, the company signed financing agreements worth approximately €229 million for the Părău 2 project in Brașov County. It will include a 342 MWp photovoltaic plant and 150 MW of storage batteries, with commissioning estimated for the end of 2027 or the beginning of 2028.

Econergy recently also announced the grid connection of the 59 MW Iancu Jianu photovoltaic project in Olt County. The company has 743 MW of connected or connection-ready capacity in Romania, as well as another 861 MW under construction.

家

Sources

sursa imagine
Economica
Nou parc eolian în România: Israelienii de la Econergy urmează să obțină autorizația de la ANRE pentru încă 120 MW în Buzău
sursa imagine
Profit.ro
Investiție în România. Israelienii de la Econergy fac parc eolian de peste 125 MW în Buzău

Latest News

11:31

Tulcea ISU issued a RO-Alert message following a possible drone incursion in the northern part of the county

11:28

A Moldovan and a Romanian were arrested in Milan, suspected of stealing two luxury cars worth 310,000 euros

11:08

Commission identifies shortages in vaccines, treatments and stockpiles for five health threats

11:05

The Republic of Moldova is preparing to fully adopt the EU sanctions against Russia and Belarus, until joining the bloc

10:58

The Presidential Administration responds to the AUR report on the annulment of the 2024 elections: “It brings no new arguments to the legal debate”

See more news

NEWS ON THE SAME TOPICS

event image
Economy
Rezolv Energy secures financing of up to 367 million euros for the Dunărea East wind farm in Constanța
event image
Economy
OMV Petrom and Renovatio have commissioned three photovoltaic parks that supply energy and can power more than 110,000 households
event image
Economy
Electrica and Liberty Galați plan a 250 MW solar park and battery storage facilities on 240 hectares
event image
Economy
Simtel Team has signed a €17.5 million contract for a solar power plant in Alba
event image
Economy
The government has approved the project for the development of offshore wind farms in the Black Sea
event image
Current Affairs
ANRE launches inspections of distributors over delays in connecting new energy capacity
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
tulcea wind farm Green energy Nucarilor Valley photovoltaic parks

Editor’s Recommendations

main event image
Politics
39 minutes ago

The Presidential Administration responds to the AUR report on the annulment of the 2024 elections: “It brings no new arguments to the legal debate”

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+1
main event image
International
2 hours ago

CNN analysis: The war between Ukraine and Russia is spreading throughout Europe, and there are two reasons why the situation will worsen

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+1
main event image
Exclusive
44 minutes ago
Original Content

November 24, 2026. TV: What was discussed last night on the news channels

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol