search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
135 new news items in the last 24 hours
  1. Home
  2. Current Affairs

ELCEN will temporarily stop CET Grozăvești on Sunday night, August 16, for the relocation of the flow meter, with minimal impact on consumers.

Liviu Brăteanu
whatsapp
facebook
linkedin
x
copy-link copy-link
16 August 2026, 13:21
main event image
Current Affairs
Foto: Inquam Photos / George Călin
google-preference

Always see our news on Google

Electrocentrale București S.A. (ELCEN) has announced a temporary and controlled shutdown of the Grozăvești CHP, scheduled for the night of Sunday, August 16, at 10:00 PM, until Monday, August 17, at 12:00 PM. This measure is necessary due to the relocation works of the flow meter carried out by the company Apa Nova București, which will suspend the water supply between Sunday evening and Monday morning. ELCEN emphasized that the water source is essential for the chemical treatment process, necessary for obtaining demineralized water used in the heating circuit.


The shutdown has been scheduled during the period of lowest thermal energy consumption to minimize the impact on the residents of the Capital. The effects on consumers will be reduced, consisting of a temporary decrease in the hot water parameters on Monday morning, and ELCEN teams will resume the supply immediately after the completion of the works, ensuring a return to normal parameters by 12:00 PM.

Sources

sursa imagine
Stirile ProTV
Electrocentrale Bucureşti a anunţat oprirea pentru 14 ore a CET Grozăveşti din cauza unor lucrări Apa Nova la reţeaua de apă - Știrile ProTV
sursa imagine
News.ro
Electrocentrale Bucureşti anunţă oprirea pentru 14 ore a CET Grozăveşti din cauza unor lucrări ale Apa Nova la reţeaua de alimentare cu apă

Latest News

23:00

NASA has published images of the crater formed on the Moon after the Falcon 9 rocket stage crashed on August 5.

22:53

ECB: Europe cannot afford to miss the opportunities offered by artificial intelligence

22:49

Energy consumption is on the rise. When is the peak consumption expected this year?

22:45

The assessment of the buildings affected by the explosion in Rahova has begun. The operation will conclude on September 9.

22:35

Bogdan Ivan responds to Ilie Bolojan, asking him to confirm that large energy consumers will not be affected by power cuts.

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
ELCEN will temporarily stop the natural gas supply to the Grozăvești power plant on Monday. The intervention will last six hours.
event image
Current Affairs
ELCEN has announced the preventive shutdown of the energy group at CET Grozăvești due to extreme temperatures.
event image
Current Affairs
Constanța will interrupt the hot water supply starting August 16, at 10:00 PM, for maintenance work.
event image
Current Affairs
Grozăvești CET resumes electricity production, providing 30 MW for the stabilization of the National Energy System.
event image
Current Affairs
Modernization works announced for the thermal network in Bucharest: 1,500 blocks will remain without hot water
event image
Current Affairs
Hot water will be interrupted in several areas of Bucharest in the second half of July for works on the thermal network.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
ELCEN CET Grozăvești maintenance works

Editor’s Recommendations

main event image Play button
12 hours ago
Podcast

PODCAST NewMoney / Cristian Busoi: We will take action against those who speculate on energy contracts for high prices

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol