OMV Petrom and Enery have signed a partnership to develop the Gabare photovoltaic park, located in Byala Slatina, Bulgaria, with a capacity of 400 MW. OMV Petrom will acquire 50% of the shares and will have a long-term contract for 50% of the electricity production. The project will also include a battery energy storage system. The total investment amounts to around €200 million and commercial operations are expected to start in 2027.
Sources
Latest News
13:51
The interim Minister of Defense, Radu Miruţă, about the future government: "We have stated what the thresholds are for us to sit at the table, we will no longer vote for a government with PSD. PNL, USR, and UDMR no longer have a place in the same chamber with PSD."
13:50
The BNR launches a silver coin dedicated to Nicolae Tonitza, on the 140th anniversary of his birth. The coin is rectangular in shape and is worth 10 lei.
13:48
Major breakdown on the Berceni Pipeline: Sector 4 remains without hot water
13:43
Spontaneous protest in Arad, dozens of victims demand the recovery of their money or the delivery of the paid cars
13:35
Firefighter found shot in the IGSU unit in Mizil, investigation underway
See more news