search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
149 new news items in the last 24 hours
  1. Home
  2. Economy

The National Company for Road Investments has designated IRD ENGINEERING as the winner of the supervision contract for section 1D Joseni-Ditrău of the A8 Highway, worth 30 million lei.

Liviu Brăteanu
whatsapp
facebook
linkedin
x
copy-link copy-link
13 November 2025, 13:01
main event image
Economy
Foto: Pixabay
google-preference

Always see our news on Google

The National Company for Road Investments (CNIR) announced that the Italian company IRD ENGINEERING has won the contract for supervising the design and execution works on section 1D Joseni – Ditrău of the Unirii A8 Highway, with a value of 30 million lei (excluding VAT). The contract, funded from European funds, has a duration of 98 months, including both the period for carrying out the works and the warranty. The role of the supervisor is crucial, having the responsibility to monitor the progress of the works, the quality of materials, and the performance of the execution team.


Section 1D has a length of 14.4 km and includes 21 passages and viaducts, as well as a road junction at Joseni. This is the second supervision contract awarded for the mountainous section of A8, after the one for section 2A Ditrău – Grințieș. Additionally, the Joseni – Ditrău section has been the subject of legal disputes, with previous challenges related to the bidding process. The total estimated value for this section is between 1.02 billion and 1.2 billion lei (excluding VAT).

Sources

sursa imagine
psnews.ro
VIDEO Autostrada Unirii A8: CNIR a desemnat supervizorul celui mai disputat lot montan, Joseni – Ditrău
sursa imagine
Economica
Autostrada Unirii A8: CNIR a desemnat supervizorul celui mai disputat lot montan, Joseni – Ditrău

Latest News

08:12

EXCLUSIVE | September 25, 2026. Online Search Trends / Past 24 Hours

08:10

Emmanuel Macron warns of the energy crisis / Sends “military assets” to Saudi Arabia

08:06

Start for the Tricolors in the 2026/27 Nations League edition. What time does Sweden - Romania start? Who is broadcasting the match? Starting lineup

07:52

The Secretary of State in the Ministry of Energy, Cristian Bușoi, announces that Romania’s gas storage facilities are 79% full, above the European average

07:50

Finland’s President asks Elon Musk to expand Starlink access for Ukraine’s strategic operations

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
The CNIR approved the Technical Project for section 1D Joseni-Ditrău of the A8 Highway, and the works will begin on August 17, 2026.
event image
Current Affairs
The Secretary of State in the Ministry of Transport announced the issuance of the construction permit for the first lot of the mountain sector of the Unirii Highway A8
event image
Current Affairs
Horațiu Cosma announces record mobilization on the Joseni-Ditrău section of the A8 Motorway
event image
Current Affairs
The Bucharest Court of Appeal suspended the contract for Section 4 of the A8 Highway Târgu Neamț-Iași-Ungheni
event image
Current Affairs
Ilie Bolojan announced the signing of the SAFE contract for section 4 of the "Union" A8 Highway, which will connect Romania to the Republic of Moldova.
event image
Current Affairs
CNIR conducts tests for the design of a section of the A8 Highway
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
IRD ENGINEERING CNIR A8

Editor’s Recommendations

main event image
Politics
1 hour ago

The designated prime minister, Siegfred Mureşan, says that the times when the PSD was a 45% party are over and will not return / “The old days, when they were a great 45% empire, will never return”

Sources
imagine sursa
imagine sursa
main event image
Opinions
Yesterday 08:57

Andrei Pleșu: What Is Allowed and What Is Not

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol