search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
160 new news items in the last 24 hours
  1. Home
  2. Economy

Romanian Electric Networks has launched a tender of up to 387 million lei for works in the high voltage installations in Southern Muntenia, Banat, and Dobrogea.

Liviu Brăteanu
whatsapp
facebook
linkedin
x
copy-link copy-link
9 July 2026, 17:24
main event image
Economy
Foto: Pixabay
google-preference

Always see our news on Google

Electric Networks Romania has initiated a tender on the SEAP platform, with an estimated maximum value of 387 million lei (excluding VAT), for contracts for works in high voltage installations in the three serviced areas: Muntenia Sud, Banat, and Dobrogea. The projects aim to connect, reinforce the network, and expand the substations and power lines in Bucharest and the counties of Ilfov, Giurgiu, Arad, Caraș-Severin, Hunedoara, Timiș, Constanța, Tulcea, Ialomița, and Călărași.


The tender is structured into 3 lots corresponding to the three operational regions. The works will include preliminary activities, land systematizations, works on poles, dismantling and installation of new equipment. The deadline for submitting offers is August 17, 2026, and the contract duration will be 60 months. Electric Networks Romania commits to comply with legal environmental protection requirements during the execution of the works. The company operates an extensive network of 136,000 km, covering one third of the local distribution market.

Sources

sursa imagine
News.ro
Reţele Electrice România lansează o licitaţie de până la 387 milioane de lei pentru lucrări în instalaţiile electrice de înaltă tensiune
sursa imagine
Capital
Rețele Electrice pregătește investiții de până la 387 de milioane de lei. Lucrările vor viza rețelele de înaltă tensiune din trei regiuni ale țării

Latest News

22:56

EU ambassadors are expected to approve 1,650 new designations against Russia

22:53

Shakira and Gerard Piqué in court in Barcelona to modify the visitation schedule for their two sons

22:47

George Simion denies donations from Russia to the party and calls for state budget subsidies to be scrapped

22:45

Nicu Ștefănuță was elected co-president of the Greens/EFA Group in the European Parliament

22:38

Azores lose over 100,000 passengers after Ryanair's withdrawal. Tourism feels the reduction in air connections

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Romania’s Electricity Energy Distribution Company is allocating 7.7 million lei to secure data centers
event image
Economy
Rețele Electrice România has completed the modernization of the Filaret electrical substation with investments of nearly 79 million lei
event image
Current Affairs
DEER has signed a contract for the modernization of the electrical network in Cluj-Napoca and Florești, benefiting from 237 million lei from European funds.
event image
Current Affairs
The shareholders of Electrica have approved an investment project of 235 million euros for the construction of electricity and thermal energy production facilities in Craiova, including for Ford Otosan.
event image
Current Affairs
Transgaz allocates over 108 million lei for the first section of the Huedin-Lugașu gas pipeline
event image
Economy
Transelectrica launches the pilot project to digitalize the Alba Iulia substation, an investment of 476 million lei
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
bidding installations South Muntenia Banat Dobrogea

Editor’s Recommendations

main event image
Current Affairs
3 hours ago

CNAIR announces the resolution of the TollRo problems. Drivers will not be fined if they tried to pay during the malfunctions

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol