The Infotrafic Center within the General Inspectorate of the Romanian Police has announced traffic restrictions on the A0 Bucharest Ring Road and on DN 1A, due to necessary works. On DN 1A, between the Bucharest Ring Road and Chitila-Mogoșoaia Road, expansion works to four traffic lanes are being carried out in two stages: the first stage until 11.01.2026, with narrowed traffic, and the second stage between 12.01.2026 and 15.05.2026, using a service variant.
On the A0 Highway, between kilometers 89+060 and 94+600, reflective buttons are being installed until 15.11.2025, and the acceleration/deceleration lanes will be marked by buoys and signs. Additionally, on the A1 Sibiu – Deva Highway, road markings are being applied on the section 237+800 – 292+455, until 31.12.2025, depending on weather conditions. Drivers are advised to drive at reduced speed and to respect the temporary signage.
On the A0 Highway, between kilometers 89+060 and 94+600, reflective buttons are being installed until 15.11.2025, and the acceleration/deceleration lanes will be marked by buoys and signs. Additionally, on the A1 Sibiu – Deva Highway, road markings are being applied on the section 237+800 – 292+455, until 31.12.2025, depending on weather conditions. Drivers are advised to drive at reduced speed and to respect the temporary signage.
Sources
Restricții de circulație pe A0 – Autostrada Bucureștiului și pe DN 1A, între Centura Capitalei și Șos. Chitila-Mogoșoaia. Se fac diferite lucrări
Restricții de circulație pe A1 și A2. Lucrări și marcaje rutiere până marți seara
Restricții de circulație pe A1 și A2: Noi lucrări și marcaje rutiere sunt în desfășurare
Latest News
16:38
The Commission checks whether ChatGPT and Roblox should be designated as very large online services under the DSA.
16:37
The Danube's flow has dropped to historic lows due to drought, affecting navigation, energy, and agriculture. Remains of mammoths and wrecks have been discovered.
16:36
The sale process of the Liberty Galați steel plant is moving towards direct negotiations with three remaining investors, after two international tenders were unsuccessful.
16:35
Temu risks a fine of up to 1% of its turnover for possible obstruction of a European inspection
16:28
The commission examines AI tools that could generate non-consensual sexual images of women and children.
See more news