search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
137 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Interim Mayor Stelian Bujduveanu announces the reconstruction of a heritage building on Lipscani Street, with an investment of 7.2 million lei and a completion period of two years.

Raluca Ioana Draghici
whatsapp
facebook
linkedin
x
copy-link copy-link
29 October 2025, 12:37
main event image
Current Affairs
Facebook/ Stelian Bujduveanu
google-preference

Always see our news on Google

The interim mayor of the Capital, Stelian Bujduveanu, announced that a heritage building located on Lipscani Street, in the Old Town, will undergo reconstruction. This intervention is deemed necessary for the safety of residents and for the protection of the city's heritage, considering the high seismic risk of the property. Bujduveanu emphasized that, although the building will be rebuilt, the original architecture will be preserved, and the new structure will comply with current resistance standards. The total value of the investment amounts to 7.2 million lei, excluding VAT, and the execution period is 24 months. The project is part of a broader program of the Capital City Hall, which aims to reduce seismic risk in vulnerable buildings, currently having 13 ongoing strengthening sites.

Sources

sursa imagine
News.ro
Primarul Capitalei anunţă refacerea unei construcţii de patrimoniu cu risc sesimic, din Centrul Vechi: Este o intervenţie necesară într-o zonă intens circulată. Imobilul va fi refăcut păstrând arhitectura originală, dar cu o structură nouă - FOTO
sursa imagine
B365
FOTO | O clădire istorică de pe istorica stradă Lispcani va fi refăcută complet, așa cum era în Vechiul București. Acum, are risc seismic ridicat și poate să se prăbușească oricând
sursa imagine
Antena3
Stelian Bujduveanu: Clădirea din Strada Lipscani nr. 70, aflată în risc seismic ridicat, intră în reconstrucţie

Latest News

22:25

Ilie Bolojan calls for the PNL to be rebuilt through truth, accountability and strong teams

22:02

Donald Trump promotes Stephen Miller to White House chief of staff

21:29

President of the Bavarian State Parliament backed for the German presidency / The nomination of the CSU politician could be confirmed on Monday

21:28

Sviatlana Tsikhanouskaya received the Prize for European Values in Timișoara and will donate the money to Belarusian culture

20:57

Dmitri Medvedev accuses Elon Musk of becoming a participant in the war in Ukraine by providing Starlink services

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Bucharest City Hall begins work at Curtea Veche: two million lei allocated to secure the monument
event image
Current Affairs
Pedestrianization and new bridges: The Capital City Hall launches major urban regeneration projects
event image
Current Affairs
Five bids submitted to Bucharest City Hall for the reconstruction of Calicilor Bridge and the modernization of the Dâmbovița riverbanks between Unirii Square and Izvor Bridge
event image
Current Affairs
Bucharest City Hall is accelerating 12 major infrastructure projects in 2026
event image
Current Affairs
The Mayor of the Capital, Ciprian Ciucu, explained the necessity of the construction sites for the modernization of the city.
event image
Politics
General Mayor Ciprian Ciucu: Bucharest City Hall lost 80% of the PNRR funds before I became mayor
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Bucharest Stelian Bujduveanu Lipscani reconstruction historical buildings Cultural heritage seismic risk consolidation works Capital City Hall

Editor’s Recommendations

main event image
INSCOP Surveys
12 hours ago

November 2026: Informat.ro – INSCOP Research BAROMETER, 15th Edition - Chapter II: The Priorities of the Luca Niculescu Government | 23.9% of Romanians mention creating jobs for young people as the main priority of the new Government over the next 6 months

main event image
Opinions
5 hours ago

Andrei Cornea: Democracy versus networks

main event image
Exclusive
10 hours ago

EXCLUSIVE | Romania, in the view of the Russian press: Ukraine’s “logistical rear”

main event image
Exclusive
4 hours ago

SPECIAL From Babasha to eMAG. "The bad manea" and "the useful manea"

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol