search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
51 new news items in the last 24 hours
  1. Home
  2. Current Affairs

The Capital City Hall is rehabilitating and strengthening the Opera Bridge/ The works will take 24 months

Raluca Ioana Draghici
whatsapp
facebook
linkedin
x
copy-link copy-link
30 September 2026, 18:59
main event image
Current Affairs
facebook.com/ Primăria Municipiului Bucureşti
google-preference

Always see our news on Google

Bucharest City Hall approved the rehabilitation and strengthening project for the Opera Bridge, following a vote by the general councillors, at the initiative of General Mayor Ciprian Ciucu. The works are necessary because the passage over the Dâmbovița River is in an unsatisfactory technical condition, and the intervention will last 24 months.

The project provides for four months for the preparation of the technical design and another 20 months for carrying out the works. The objective is to restore the deteriorated elements, strengthen the structure, and improve safety for road and pedestrian traffic.

According to Bucharest City Hall, the roadway and sidewalks have cracks and uneven surfaces, the paving stones in the parking area are damaged, the signposts are deformed, the support beams have cracks, and the railing no longer provides sufficient safety. Water infiltration is affecting the structure, and the bridge does not have anti-seismic devices.

The bridge plays a strategic role in traffic in Bucharest, providing a connection between the city center and the western neighborhoods, as well as access to the A1 Motorway.

The central section was built in 1986, as part of the development of the Dâmbovița River, and the bridge was extended in 1993. At present, the total width of the structure reaches 124.79 meters.

Sources

sursa imagine
EVZ.ro
Podul Operei din București intră în reabilitare
sursa imagine
Capital
Podul Operei din București intră în reabilitare. Lucrările vor dura 24 de luni

Latest News

16:19

Voters in the Autonomous Territorial Unit of Gagauzia have reached the turnout threshold required to validate the elections

15:58

RO-Alert message issued in Tulcea following a possible drone incursion

15:32

Alexandru Rogobete is considering replacing residency positions with training places

15:13

Nicușor Dan met in Phnom Penh with the UNESCO Director-General

14:43

Alexandru Rogobete: “Romania’s pharmaceutical market has begun to become increasingly controlled by the major pharmacy chains”

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Five bids submitted to Bucharest City Hall for the reconstruction of Calicilor Bridge and the modernization of the Dâmbovița riverbanks between Unirii Square and Izvor Bridge
event image
Current Affairs
Ciprian Ciucu Announces the Reopening of Basarab Bridge After Nearly Three Months of Works
event image
Current Affairs
PMB announces the closure of the construction site at Constanța Bridge around October 15
event image
Current Affairs
Completion of the main works on Unirii slab will take place by the end of 2026
event image
Current Affairs
Pedestrianization and new bridges: The Capital City Hall launches major urban regeneration projects
event image
Current Affairs
The Municipality of Bucharest is putting up for auction a contract of 64 million lei for the arrangement of the banks of the Dâmbovița River and the reconstruction of the Calicilor Bridge.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Bucharest Capital City Hall highway a1 raul Dâmbovița road traffic rehabilitation consolidation

Editor’s Recommendations

main event image
Current Affairs
2 hours ago

Dacian Cioloș and the race for the leadership of the International Organisation of La Francophonie: the stakes for Romania and its role as a balancing factor

main event image
Current Affairs
2 hours ago

The Minister of Defense announced that he will request air patrols and anti-drone equipment in Brussels following the attacks on ships in the Black Sea

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+2
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol