search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
93 new news items in the last 24 hours
  1. Home
  2. Current Affairs

The Sector 4 City Hall will sign next week the contract for the design and execution of the extension of the M4 subway line, which will include 14 new stations between Gara de Nord and Gara Progresul.

Ana-Maria Tapescu
whatsapp
facebook
linkedin
x
copy-link copy-link
28 November 2025, 08:19
main event image
Current Affairs
Foto: shutterstock.com
google-preference

Always see our news on Google

Daniel Băluță stated that the works will begin with the design of the Gara de Nord – Eroii Revoluției section, followed by the transition to lot 2, between Eroii Revoluției and Gara Progresul. The Turkish-Bulgarian association Dogus – Trace won the bid for the execution of the first section, after the complaint of another contractor was rejected. The project has a total length of approximately 11 kilometers and a value of over 2 billion euros, with an estimated non-reimbursable funding of 2.5 billion euros.

The works are scheduled to last a maximum of 60 months, with the first eight months dedicated to design. The new line will cross sectors 1, 4, and 5, including the Jilava commune, and will include a modern depot with a park&ride parking lot.

Sources

sursa imagine
Mediafax
Daniel Băluță anunță că săptămâna viitoare va fi semnat contractul pentru extinderea magistralei de metrou M4
sursa imagine
B365
ESENȚIAL | Extinderea M4, noua magistrală de metrou din București, poate începe. Ultima contestație care bloca proiectul a fost respinsă
sursa imagine
Profit.ro
ANUNȚ O nouă linie de metrou gata de execuție VIDEO
sursa imagine
Economica
Proiectul unei noi linii de metrou în București începe de săptămâna viitoare

Latest News

18:27

FEMM requests 10.72 billion euros for AgoraEU and at least 16% for combating gender-based violence

18:19

The European Union has declared that the presence of the Russian finance minister at the G20 is inappropriate, emphasizing that it is not the time to normalize relations with Moscow.

18:18

A 13-year-old boy was taken to the Royal Hospital for Children in Edinburgh after a rugby accident. He was asked if he was pregnant before an X-ray.

18:01

The Mayor of the Capital, Ciprian Ciucu, explained the necessity of the construction sites for the modernization of the city.

17:54

The nuclear power plant at Kozloduy returns to normal production capacity.

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
The Ministry of Transport is unblocking the extension of the M4 subway line.
event image
Current Affairs
The Sector 6 City Hall received the association protocol from Metrorex for the extension of Line M3 towards Militari Residence
event image
Current Affairs
The mayor of Sector 4, Daniel Băluță, criticizes the Minister of Transport for not paying the bills and blocking funding for the M4 subway line, citing political grievances.
event image
Current Affairs
Ciprian Ciucu announced the start of the installation works for the tram line under the Constanța Bridge, with an estimated completion in three weeks.
event image
Current Affairs
Work on Metro Line 6 continues, with a progress of 71% on the South Section 1 Mai - Tokyo. The project will connect the North Station with Henri Coandă Airport.
event image
Current Affairs
The subway circulation is interrupted between the 1 Mai and Jiului stations. Metrorex announces a technical problem.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
contract M4 metro Enlargement Metrorex subway Bucharest signing contract

Editor’s Recommendations

main event image
Politics
6 hours ago

President Nicușor Dan, speech in front of 2,400 Orthodox youth: "The public space is dominated by defeatists who say that we will never be able to do anything in this country. It seems that we no longer have the patience to listen to each other."

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
main event image
Exclusive
9 hours ago
Original Content

01 September 2026. TV: What was discussed last night on the news channels

main event image
Current Affairs
5 hours ago

A drone was found crashed in a field in Vaslui County / Authorities are conducting checks

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol