search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
134 new news items in the last 24 hours
  1. Home
  2. Current Affairs

The works to widen the Capital's Beltway have resumed, targeting the segment that intersects with the A2 Highway.

Ana Maria Eftene
whatsapp
facebook
linkedin
x
copy-link copy-link
27 November 2025, 08:02
main event image
Current Affairs
Foto: https://www.shutterstock.com/
google-preference

Always see our news on Google

The project, which will last approximately two years, will include the widening of the road to two lanes in each direction and the construction of three road overpasses. Although the works started late, the contractor has a completion deadline of two years. Traffic could become lighter next summer, when the completion of the A0 Motorway is estimated, which will take on some of the vehicle flow. Currently, there are no traffic restrictions imposed, but the works are complicated by the utility networks in the area, which require relocation. These improvements will facilitate the connection between the localities in the east and southeast of the Capital, contributing to reducing congestion.

Sources

sursa imagine
Stirile ProTV
Centura Capitalei intră în șantier după ani de așteptare. Segmentul spre A2 va fi lărgit
sursa imagine
B365
Speranța moare ultima: s-au reluat lucrările de lărgire pe Centura Capitalei, pe un segment infernal din DNCB, care se intersectează cu A2. Cât va dura șantierul

Latest News

12:48

WhatsApp experienced a temporary malfunction that affected the sending of photos and multimedia files for millions of users

12:41

India proposes extending tax incentives for foreign companies that supply equipment to local manufacturers until 2041, a measure considered beneficial for Apple.

12:40

The European fund for expanding technology companies starts investments, with an interest of 5 billion euros

12:37

Romania joins the Carpathian Initiative for regional cooperation, launched by Volodymyr Zelensky

12:36

Cristian Bușoi, Secretary of State in the Ministry of Energy, stated that the supply of fuels has improved compared to two weeks ago.

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Two new road passages will be built in Ilfov: a three-level passage in Balotești and an underground passage in Bragadiru
event image
Current Affairs
The works on the bypass road of the city of Buftea have reached 34% execution stage.
event image
Current Affairs
The Afumați - Pantelimon section of the Capital's Ring Road is completed at a rate of 90%
event image
Current Affairs
A new road will connect the A0 Highway to Terminal 2 of Henri Coandă Airport, reducing the travel time from 20 to 2 minutes.
event image
Current Affairs
The works on A0 North, lot 1 (Joița-Corbeanca), have reached a physical stage of 63%
event image
Current Affairs
The Capital City Hall announces work over the weekend for the rapid closure of construction sites and to avoid the loss of European funds.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Capital Ring Road building site road widening A2

Editor’s Recommendations

main event image
Current Affairs
3 hours ago

Radu Miruță, after the controlled explosion at Cernavodă: "Good news: at the nuclear power plant in Cernavodă, the water level has risen by 2cm compared to yesterday"

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+3
main event image
Current Affairs
1 hour ago

The Bucharest Court of Appeal suspended the Bolojan Government's regulations regarding the suspension of licenses for drivers with unpaid fines, at the request of the PSD.

Sources
imagine sursa
imagine sursa
imagine sursa
main event image
Exclusive
52 minutes ago

EXCLUSIVE Romania, Trump and the new Atlantic equation: how much is the bet on a single man worth

main event image
Exclusive
3 hours ago
Original Content

EXCLUSIVE | August 4, 2026. Trends in online searches / last 24 hours

main event image
Exclusive
2 hours ago
Original Content

August 4, 2026. TV: What was discussed last night on the news channels

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol