search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
184 new news items in the last 24 hours
  1. Home
  2. Current Affairs

City Hall: The works at Basarab Passage could be completed by December 2026

Liviu Brăteanu
whatsapp
facebook
linkedin
x
copy-link copy-link
26 February 2026, 18:01
main event image
Current Affairs
Foto: Pixabay
google-preference

Always see our news on Google

The Capital City Hall announces that the works to secure the Basarab Passage could start in June and are expected to be completed by December 2026, according to a statement issued after the meeting between the general mayor Ciprian Ciucu and the representatives of the builders.


The municipality specifies, however, that the exact deadlines and costs will be established after the design is completed. Used in 2011-2012 without final acceptance, the passage could not be properly maintained, which led to the degradation of several elements, from the rainwater system and joints to elevators and the structural integrity. The interventions will be split between the builder, who will remedy the execution deficiencies, and the city hall, which will cover the degradations that occurred due to lack of maintenance.

Sources

sursa imagine
Hot News
Cât estimează Primăria Capitalei că vor dura lucrările la Pasajul Basarab, aflat „de aproape 15 ani într-o situație incertă”
sursa imagine
News.ro
Primăria Capitalei anunţă că va pune în siguranţă Pasajul Basarab, „o problemă istorică a Bucureştiului”: Lucrările ar putea începe în iunie şi să fie gata în decembrie

Latest News

19:39

Marius Lulea criticizes George Simion and challenges his expulsion from AUR

19:31

Romania and Bulgaria receive EU satellite imagery following attacks on vessels in the Black Sea

19:24

A Romanian man died in Italy after his motorcycle collided with a truck

19:20

Alexandru Nazare meets with the NBR and ASF to prepare for the ECOFIN meeting

19:18

A Romanian man was arrested in Italy after stealing 2,000 euros from a woman while she was using an ATM

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Bucharest City Hall announces the resumption of work on the Basarab Overpass
event image
Current Affairs
Starting tomorrow, the Basarab Passage will reopen in the Titulescu-Grozăvești direction. The passage will fully reopen on September 7.
event image
Current Affairs
Ciprian Ciucu Announces the Reopening of Basarab Bridge After Nearly Three Months of Works
event image
Current Affairs
The Capital City Hall is accused of imposing traffic restrictions on the Basarab Passage before appointing a contractor for rehabilitation.
event image
Current Affairs
Ciprian Ciucu states that the workers who rehabilitated the Basarab Passage need to clean the area again due to vandalism. The City Hall is working on a feasibility study for a monitoring system with cameras.
event image
Current Affairs
The Capital City Hall is rehabilitating and strengthening the Opera Bridge/ The works will take 24 months
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Basarab Passage Bucharest 2026

Editor’s Recommendations

main event image
Current Affairs
5 hours ago

The Chamber of Deputies adopted new rules for motorcycles, including conditional access to public transport lanes

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
main event image
Exclusive
7 hours ago

ANALYSIS France’s overlapping crises and the lessons for Europe and Romania

main event image
Exclusive
10 hours ago

Exclusively Monitorul Miniștrilor by NewsVibe: 1–7 October 2026 / Alexandru Nazare leads the visibility rankings amid debates about the country's rating

main event image Play button
3 hours ago
Politics

Remus Ștefureac on what polls tell us about Romania and what politicians fail to understand about them

main event image
Current Affairs
5 hours ago

SUMMARY The Adamescu Case and the Shadow of the Former Head of German Intelligence, August Hanning

main event image
Exclusive
10 hours ago
Original Content

EXCLUSIVE | October 7, 2026. Online search trends / last 24 hours

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol