search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
73 new news items in the last 24 hours
  1. Home
  2. Economie
3 hours ago

Daniel Băluță presents the progress of the Apărătorii Patriei Overpass and the construction’s “eccentric pillars”

Cristiana Dida
whatsapp
facebook
linkedin
x
copy-link copy-link
12 September 2026, 14:12
main event image
Current Affairs
Foto: Facebook/ Daniel Băluță
google-preference

Always see our news on Google

Sector 4 Mayor Daniel Băluță presented images on Facebook on Saturday showing the progress of work on the Apărătorii Patriei Overpass, including the inside of the “eccentric pillars” supporting the structure. The mayor explained that, at this stage, the components needed to continue construction are being installed and assembled.

The overpass is being built over Berceni Road, near the intersection with Turnu Măgurele and Sergent Ion Iriceanu streets. The project provides for a structure approximately 860 metres long, with two traffic lanes in each direction.

The investment is estimated at approximately €20 million, with funding coming from the local budget of Sector 4. The works are being carried out by the association of Concelex, Omega Star Systems, Alpenside, Luxten and PAB România.

Daniel Băluță presented the first images of the overpass model in April last year. Sector 4 City Hall estimates that the works could be completed by the end of 2026.

שרת,

Sources

sursa imagine
Mediafax
Pasajul Apărătorii Patriei prinde contur. Daniel Băluță prezintă stâlpii "excentrici" ai construcției finanțate cu 20 de milioane de euro
sursa imagine
B365
VIDEO | Cum arată pe interior stâlpii excentrici de la Pasajul Apărătorii Patriei. Investiția de 20 de milioane de euro va contribui la fluidizarea traficului din zona Berceni
sursa imagine
G4Media
Sectorul 4: Stâlpii "excentrici" ai Pasajului Apărătorii Patriei, parte din structura masivă a proiectului de aproximativ 20 de milioane de euro

Latest News

19:00

Authorities in Congo confirm more than 7,000 Ebola cases as the epidemic spreads to a seventh province

18:50

Zelensky ready to meet Putin at G20 / Kremlin says Russian leader’s attendance has not been decided

18:40

Alexandru Nazare married singer Maria Mihali. The wedding godfather is the Greek Minister of Finance, Kyriakos Pierrakakis

18:35

Lawmakers propose allowing 16-year-old students to seek psychological counseling on their own

18:30

German investigators suspect the GRU of coordinating the logistics of an attack involving an explosives-laden drone at Leipzig Airport

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
The Capital City Hall announced the start of the rehabilitation works of the Basarab Passage on June 20
event image
Current Affairs
The Mayor of Sector 4, Daniel Băluță, announced the reopening of traffic in Union Square, between Independence Boulevard and Corneliu Coposu Boulevard.
event image
Current Affairs
PMB announces the closure of the construction site at Constanța Bridge around October 15
event image
Current Affairs
The Bucharest City Hall has approved the construction of the Petricani Passage
event image
Current Affairs
Two new road passages will be built in Ilfov: a three-level passage in Balotești and an underground passage in Bragadiru
event image
Current Affairs
The intersection between Colentina Road, Fundeni Road, Andronache Road, and Gherghitei Street will be reconfigured to improve traffic flow. The works will last 12 months.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
daniel baluta Concelex Sector 4 PAB Romania Defenders of the Fatherland passage

Editor’s Recommendations

main event image
Current Affairs
1 hour ago

Romania’s Ministry of National Defence confirms a drone crashed in Suceava after an alert was sent to residents of Botoșani

Sources
imagine sursa
imagine sursa
imagine sursa
main event image
Health
6 hours ago

Bucharest’s Neurology Institute postpones procedures due to a shortage of materials

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+1
main event image
Opinions
Yesterday 17:01

Andrei Cornea: Who Wants to Become a Politician?

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol