search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
128 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Interim Mayor Stelian Bujduveanu announced progress in investments for the heating network in Bucharest, with 200 km of pipes replaced by the end of the year.

Liviu Brăteanu
whatsapp
facebook
linkedin
x
copy-link copy-link
20 September 2025, 11:45
main event image
Current Affairs
Foto Inquam Photos / George Călin
google-preference

Always see our news on Google

Stelian Bujduveanu, the interim mayor of the Capital, stated that investments in the heating network in Bucharest are progressing well, with 50 km of pipes replaced this year and a target of 200 km by the end of the year. Bucharest has the largest centralized heating system after Moscow, but it needs significant repairs. Bujduveanu emphasized the importance of reinvesting funds from electricity sales into local infrastructure. Problems with hot water are related to the lack of investment in the networks, but the mayor promises continuous improvements.

Sources

sursa imagine
G4Media
Primarul general interimar al Capitalei: Lucrurile merg foarte bine din punct de vedere al investiţiilor / După Moscova, al doilea cel mai mare sistem centralizat din lume pe termoficare este în Bucureşti / Aş putea să spun - o să fIe extraordinar la iarnă, dar nu o să fie
sursa imagine
News.ro
Stelian Bujduveanu: Lucrurile merg foarte bine din punct de vedere al investiţiilor / După Moscova, al doilea cel mai mare sistem centralizat din lume pe termoficare este în Bucureşti / Aş putea să spun - o să fIe extraordinar la iarnă, dar nu o să fie

Latest News

23:12

Houthi militias in Yemen attacked two Saudi oil tankers, Wafa and Daisy, in the Red Sea and the Gulf of Aden

22:55

The British Foreign Secretary avoids answering whether he still considers Donald Trump an "idiot," "racist," and "misogynist."

22:41

Armed attack with multiple victims in Prospect Hill, North Carolina

22:20

An explosive drone was found on the runway of the airport in Leipzig / The German police deployed a bomb disposal robot

21:47

Iran and Oman have agreed on a shipping route through the Strait of Hormuz

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Bucharest City Hall: 66 blocks in Aviației and Dorobanți will have hot water through a new pipeline
event image
Current Affairs
Modernization works announced for the thermal network in Bucharest: 1,500 blocks will remain without hot water
event image
Current Affairs
Hot water will be interrupted in several areas of Bucharest in the second half of July for works on the thermal network.
event image
Current Affairs
The Bucharest Municipality has opened several infrastructure sites to avoid losing European funds.
event image
Current Affairs
Hundreds of blocks in Bucharest have been left without hot water due to works on the heating network. The repairs will last until Friday.
event image
Current Affairs
Mayor Ciprian Ciucu announces infrastructure works in Bucharest, necessary for traffic flow and improvement of public transport.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Stelian Bujduveanu progress investment District heating

Editor’s Recommendations

main event image
Politics
5 hours ago

The Chamber of Deputies adopts the national strategy for biodiversity conservation, with 177 votes "in favor".

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+1
main event image
Exclusive
11 hours ago

Exclusively the Ministers' Monitor by NewsVibe: July 29 – August 4, 2026

main event image
International
3 hours ago

Iran and Oman have agreed on a shipping route through the Strait of Hormuz

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+2
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol