search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
129 new news items in the last 24 hours
  1. Home
  2. Aktualität

Interim Mayor Stelian Bujduveanu announced progress in investments for the heating network in Bucharest, with 200 km of pipes replaced by the end of the year.

Liviu Brăteanu
whatsapp
facebook
linkedin
x
copy-link copy-link
20 September 2025, 11:45
main event image
Current Affairs
Foto Inquam Photos / George Călin
google-preference

Always see our news on Google

Stelian Bujduveanu, the interim mayor of the Capital, stated that investments in the heating network in Bucharest are progressing well, with 50 km of pipes replaced this year and a target of 200 km by the end of the year. Bucharest has the largest centralized heating system after Moscow, but it needs significant repairs. Bujduveanu emphasized the importance of reinvesting funds from electricity sales into local infrastructure. Problems with hot water are related to the lack of investment in the networks, but the mayor promises continuous improvements.

Sources

sursa imagine
G4Media
Primarul general interimar al Capitalei: Lucrurile merg foarte bine din punct de vedere al investiţiilor / După Moscova, al doilea cel mai mare sistem centralizat din lume pe termoficare este în Bucureşti / Aş putea să spun - o să fIe extraordinar la iarnă, dar nu o să fie
sursa imagine
News.ro
Stelian Bujduveanu: Lucrurile merg foarte bine din punct de vedere al investiţiilor / După Moscova, al doilea cel mai mare sistem centralizat din lume pe termoficare este în Bucureşti / Aş putea să spun - o să fIe extraordinar la iarnă, dar nu o să fie

Latest News

22:54

Iulia Navalnaya urges Russians to vote for Yabloko: the September elections, a legal referendum against the war

22:39

The air forces of Bulgaria, Romania, and Spain have signed a trilateral agreement for air policing operations within NATO.

22:30

The government has approved the 'Diaspora Invests at Home' program, which offers grants of up to 200,000 euros to Romanians from the Diaspora for businesses in Romania.

22:22

The crisis in Ceuta unites the Spanish extremes: Sumar and Vox demand the exclusion of Morocco from the 2030 World Cup.

22:14

At the County Emergency Hospital in Miercurea Ciuc, the first two prostate cancer surgeries were performed with the help of the Da Vinci robotic system.

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Bucharest City Hall: 66 blocks in Aviației and Dorobanți will have hot water through a new pipeline
event image
Current Affairs
Modernization works announced for the thermal network in Bucharest: 1,500 blocks will remain without hot water
event image
Current Affairs
Hot water will be interrupted in several areas of Bucharest in the second half of July for works on the thermal network.
event image
Current Affairs
The Bucharest Municipality has opened several infrastructure sites to avoid losing European funds.
event image
Current Affairs
Hundreds of blocks in Bucharest have been left without hot water due to works on the heating network. The repairs will last until Friday.
event image
Current Affairs
Mayor Ciprian Ciucu announces infrastructure works in Bucharest, necessary for traffic flow and improvement of public transport.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Stelian Bujduveanu progress investment District heating

Editor’s Recommendations

main event image
Opinions
Yesterday 12:44
Editorials and opinions

The open society and its narrative enemies

main event image
Opinions
Yesterday 08:52

Andrei Pleșu: 1871-2019 – immortal Romanian traditions

main event image
Opinions
Yesterday 11:26

Romania closed its coal on paper and built gas plants from words

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol