search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
169 new news items in the last 24 hours
  1. Home
  2. Current Affairs

The first new electric locomotive purchased by Romania reached 200 km/h in tests, part of a €150 million contract for 16 units.

Sanziana Georgescu
whatsapp
facebook
linkedin
x
copy-link copy-link
14 August 2025, 14:02
main event image
Current Affairs
sursa foto: unsplash.com
google-preference

Always see our news on Google

The Railway Reform Authority has announced that the first newly built electric locomotive, part of a 767 million lei contract, has reached the speed of 200 km/h at the test center in Făurei. These locomotives, produced by Alstom, will be able to pull passenger trains at a maximum speed of 160 km/h. The Romanian rail fleet has an average age of more than 45 years, and the delivery of the entire batch is expected by August 2026. The locomotives will run on several major routes in the country.

Sources

sursa imagine
Hot News
VIDEO Prima locomotivă pe care statul român a reușit să o cumpere în ultimii 15 ani a atins o viteză record în teste
sursa imagine
Newsweek
VIDEO Cum arată locomotiva care prinde 200km/oră pe calea ferată din România? Poate trage 16 vagoane | Newsweek România
sursa imagine
Economica
VIDEO Prima locomotivă cumpărată de România prin ARF a atins viteza de 200 km/h la CTF Făurei

Latest News

22:55

Cristian Bușoi, Secretary of State at the Ministry of Energy, assures that Romanians will not receive double electricity bills for the same consumption next winter

22:48

Police conducted searches in a case involving card fraud after foreign tourists were allegedly deceived in the Old Town.

22:22

Radu Miruță announces measures for Romanian grain exports and denies that Ukrainian trains are being prioritized at the Port of Constanța

22:14

Marco Rubio urges Europe to “wake up from sleep” and strengthen its defense

21:54

Bulgaria invites Romania and Turkey for consultations after drone attacks on commercial vessels in the Black Sea

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
The first 5 regional electric trains PESA have been handed over to CFR Călători, marking a historic moment for the Romanian railway.
event image
Current Affairs
The 16 Alstom Traxx electric locomotives purchased for Romania cannot be used for passenger transport due to incompatibility with the ETCS system.
event image
Economy
ARF has acquired 62 electric trains RE-R for regional transport, including 4 trains from Batch 3. The project is financed by the Modernization Fund.
event image
Current Affairs
The government approved a memorandum for negotiating a financing contract of 630 million euros regarding the modernization of the Brașov–Sighișoara railway.
event image
Current Affairs
The Baicons Impex and Arex Lider Company association has won a contract for the improvement of railway transport in Romania, with the aim of increasing the competitiveness and safety of services.
event image
Current Affairs
Railway traffic on the Lugoj - Timișoara Est section is reopening after nearly three months of modernization works.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
electric locomotive speed test trains

Editor’s Recommendations

main event image
International
1 hour ago

International Energy Agency ready to release additional oil and diesel reserves

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
main event image
Exclusive
11 hours ago

ANALYSIS France’s overlapping crises and the lessons for Europe and Romania

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol