search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
120 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Philip Morris Romania has installed solar panels at the factory in Otopeni, reducing the carbon footprint and contributing to the transition to green energy.

Cristiana Dida
whatsapp
facebook
linkedin
x
copy-link copy-link
4 November 2025, 09:47
main event image
Current Affairs
foto: Facebook/ Philip Morris International
google-preference

Always see our news on Google

Philip Morris Romania has implemented an initiative to install solar panels in the parking lot and on the roof of the factory in Otopeni, with the support of ENGIE Romania, starting from November 1st. This action is part of a broader sustainability plan, in which the company has invested over 730 million dollars since 2017 for the modernization of the factory. The solar panels, with a total capacity of 3.4 MWh, reduce the carbon footprint and support the operation of the largest industrial electric boiler in Romania.

Kurnia Adhi Sulistyawan, Manufacturing Director, emphasized the company's commitment to combating climate change and achieving carbon neutrality. The Zero Carbon Tech project, launched in 2016-2017, included energy assessments and solutions for reducing the carbon footprint. In 2024, CO₂ emissions generated by the burning of natural gas will be reduced annually by up to 10 kT. Philip Morris is also committed to responsible resource management, waste recycling, and reforestation projects, thus contributing to a sustainable future.

Sources

sursa imagine
Profit.ro
Philip Morris România investește în energie verde. La fabrica din Otopeni a fost inaugurată una dintre cele mai mari instalații de panouri solare bifaciale din România
sursa imagine
Capital
Philip Morris România investiție în energie verde la fabrica din Otopeni

Latest News

18:24

Petrișor Peiu, on administrative reform: “PSD must decide what it wants”

18:20

Csoma Botond rejects the government assuming responsibility for administrative-territorial reform and calls for parliamentary debate

18:14

Brazilian real plunges after Lula’s re-election / São Paulo stock exchange falls by nearly 17%

18:09

Luca Niculescu, after the meeting with representatives of Romania’s business community: “We must restart the engines of the economy, help those who provide jobs, not suffocate them with taxes and bureaucracy”

18:02

Austria threatens to block approval of the EU's future budget for 2028–2034

See more news

NEWS ON THE SAME TOPICS

event image
Philip Morris International contributed €343 billion to the EU economy between 2021 and 2025, according to an EY-Parthenon study
event image
International
Philip Morris International publishes its first TNFD report, featuring a global assessment of nature-related dependencies and risks
event image
Current Affairs
The Ministry of Environment is putting back into operation the photovoltaic panels installed in 2014, with an estimated production of 36,000 kWh annually
event image
Current Affairs
Rompetrol will build a 4.8 MW photovoltaic power plant at the Vega Ploiești Refinery, with an investment of 27 million lei
event image
Economy
OMV Petrom invests 115 million euros in the electrical infrastructure at Petrobrazi
event image
Economy
OMV Petrom has invested €5.4 billion of the €11 billion plan through 2030
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Philip Morris sustainability solar panels reducing carbon emissions Otopeni factory

Editor’s Recommendations

main event image
Politics
19 minutes ago

Luca Niculescu, after the meeting with representatives of Romania’s business community: “We must restart the engines of the economy, help those who provide jobs, not suffocate them with taxes and bureaucracy”

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
main event image
Opinions
7 hours ago

Democracy and Its Trials: Lessons for Romania

main event image
Exclusive
5 hours ago

ANALYSIS Midterms: Trump, the unpredictable variable. Why Democrats cannot rely on the optimism of the polls

main event image
Exclusive
7 hours ago

SPECIAL Informat.ro / Top international politics topics from the past week. Peace negotiations regarding the war in Ukraine, the Starlink dispute, and energy as a geopolitical stake

main event image
Exclusive
7 hours ago

EXCLUSIVE Top sports topics from the past week / Tributes in Romanian sport and spectacular duels in the Champions League

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol