search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
159 new news items in the last 24 hours
  1. Home
  2. Current Affairs

OMV Petrom will build a 7 MW photovoltaic park at the Petrobrazi refinery to cover part of the internal energy consumption.

Radu Burcă
whatsapp
facebook
linkedin
x
copy-link copy-link
13 February 2026, 09:06
main event image
Current Affairs
Foto: pixabay.com
google-preference

Always see our news on Google

OMV Petrom will implement a photovoltaic park with an installed capacity of approximately 7 MW at the Petrobrazi refinery, intended to provide renewable electricity for internal consumption. Franck Neel, a member of the OMV Petrom Management Board, emphasized that this project supports the company's operational efficiency and environmental objectives. The park will occupy 110,000 square meters and will include the purchase of equipment, construction works, and integration into the existing electrical infrastructure. The total budget for the project is up to 45.4 million lei, of which 8.4 million lei are non-repayable European funds. Construction works will begin soon and are expected to be completed this year. This investment joins other sustainable development projects, including a sustainable fuels unit that will produce hydrogen.


Sources

sursa imagine
Profit.ro
OMV Petrom își face parc fotovoltaic la rafinăria Petrobrazi – CONFIRMARE
sursa imagine
Financial Intelligence
OMV Petrom demarează un proiect fotovoltaic la rafinăria Petrobrazi
sursa imagine
Agerpres
Vrancea: Percheziții la adăpostul de câini privat de la Suraia

Latest News

22:56

EU ambassadors are expected to approve 1,650 new designations against Russia

22:53

Shakira and Gerard Piqué in court in Barcelona to modify the visitation schedule for their two sons

22:47

George Simion denies donations from Russia to the party and calls for state budget subsidies to be scrapped

22:45

Nicu Ștefănuță was elected co-president of the Greens/EFA Group in the European Parliament

22:38

Azores lose over 100,000 passengers after Ryanair's withdrawal. Tourism feels the reduction in air connections

See more news

NEWS ON THE SAME TOPICS

event image
Economy
OMV Petrom invests 115 million euros in the electrical infrastructure at Petrobrazi
event image
Current Affairs
Rompetrol will build a 4.8 MW photovoltaic power plant at the Vega Ploiești Refinery, with an investment of 27 million lei
event image
Economy
OMV Petrom has invested €5.4 billion of the €11 billion plan through 2030
event image
Economy
MVM Energie Romania has received ANRE authorization for the development of a photovoltaic park in Covasna. The project will be carried out on 20 hectares.
event image
Current Affairs
The Ministry of the Environment has published a guide for the funding program for batteries for photovoltaic systems
event image
Current Affairs
Solar Lady, the largest solar power plant in Europe, has received the establishment authorization from ANRE for the first phase of the project.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
OMV Petrom photovoltaic park petrobrazi refinery hydrogen

Editor’s Recommendations

main event image
International
9 hours ago

Volodymyr Zelenskyy says Russia is preparing a “massive attack” on Ukraine

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+1
main event image
International
5 hours ago

WHO assesses the risk of plague in Europe after the death of a laboratory technician in Russia / The young woman reportedly died after a test tube broke

Sources
imagine sursa
imagine sursa
imagine sursa
main event image
Current Affairs
6 hours ago

CNAIR announces the resolution of the TollRo problems. Drivers will not be fined if they tried to pay during the malfunctions

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol