Ionel Scrioșteanu, Secretary of State in the Ministry of Transport, announced that Lot 3 of the A0 South Motorway will be opened to traffic on June 30, after the completion of the acceptance and safety tests. The tests included static and dynamic measurements with loaded trucks. Work is also being finalized on the installation of crash barriers, cameras and protective fencing. Greek contractor Aktor, which has encountered delays, will incur penalties for missed deadlines.
Sources
VIDEO Autostrada A0 București Sud. Secretar de stat la Transporturi: Pe data de 30 iunie plus-minus una, maximum două zile vom da în trafic acest lot
Autostrada Bucureștiului A0: Lotul 3 Sud va fi dat în trafic pe 30 iunie, plus/minus maximum două zile – oficial Transporturi
VIDEO | Scrioșteanu, din nou pe Lotul 3 Sud al A0-Autostrada Bucureștiului. Ne prezintă stadiul lucrărilor: Până îl vom da în trafic, voi face verificări zi de zi
Latest News
14:32
Russia, first reaction after Aleksandar Vučić’s defeat in the elections in Serbia
14:28
SANITAS threatens protests and a general strike if the new Government does not address healthcare demands
14:18
The European Union introduces a two-euro handling fee for parcels from outside the bloc, including orders from Temu and AliExpress
14:15
EEA: approximately 60,000 schools and 15,000 medical facilities in Europe are located in areas with transport noise of at least 55 dB
14:04
A man was arrested after entering the Alba Iulia Police Department with an airsoft gun and a training grenade and asking to be shot
See more news