search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
124 new news items in the last 24 hours
  1. Home
  2. Current Affairs

The modernization works on the Bucharest Progresu – Giurgiu line will begin on March 16, 2026, with the reopening of traffic estimated for September 2028.

Cristiana Dida
whatsapp
facebook
linkedin
x
copy-link copy-link
12 March 2026, 11:08
main event image
Current Affairs
Foto: Facebook/ CFR Infrastructura
google-preference

Always see our news on Google

CFR SA has announced that, starting from March 16, 2026, modernization works will begin on the Bucharest Progresu – Giurgiu line, with a contract worth 2.1 billion lei. The project aims to modernize the railway infrastructure over a sector of 58 km, which currently allows trains to cover the distance in approximately 80 minutes. The reopening of traffic is planned for September 2028.

The works will include the electrification of the line, modernization of signaling installations, and implementation of the European Rail Traffic Management System ERTMS Level 2. During the works, train traffic will be suspended on certain segments, and passenger transport will be provided by shuttle buses. The contract was signed with the RailWorks Association, having a total duration of 158 months, including design and execution of the works.

Sources

sursa imagine
Hot News
CFR SA anunță începerea lucrărilor de modernizare pe linia București Progresu – Giurgiu. Când ar putea reveni trenurile
sursa imagine
Economedia
CFR începe lucrările de modernizare pe linia feroviară Bucureşti Progresu - Jilava - Giurgiu Nord Frontieră

Latest News

23:13

The Presidential Administration clarifies the photo of Nicușor Dan with Donald Trump: the image is real and was not generated by artificial intelligence

22:55

Donald Trump is preparing Jay Clayton for the position of “AI czar,” according to a source cited by Reuters

22:43

Germany extends border controls / Foreign Ministry warns Romanians traveling to or transiting the country

22:22

A Briton has been charged with preparing terrorist acts, including against Nigel Farage

22:14

Spain’s Parliament rejects Pedro Sánchez’s measures as tenant protests intensify in Madrid

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
The modernization project of the Bucharest-Giurgiu railway line has reached 12% of the work progress, with the reopening of traffic estimated for September 2028.
event image
Current Affairs
Railway traffic on the Lugoj - Timișoara Est section is reopening after nearly three months of modernization works.
event image
Economy
CFR SA has signed two contracts worth a total of 957 million lei for the modernization of signaling installations on railway sections in Cluj and Timișoara, including electronic centralizations in six stations.
event image
Current Affairs
CFR Infrastructure announces that the modernization of the railway lines in the Port of Constanța has reached 89% in Stage I and 13% in Stage II
event image
Current Affairs
Rail traffic on the Danube Bridge between Bulgaria and Romania will be completely suspended between April 5 and December 13, 2027, due to electrification works and the restoration of the railway infrastructure.
event image
Economy
The Pro Infrastructura Association is calling on CFR to reopen the Cluj-Napoca–Poieni railway line in 2027, with work 80% complete
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
cfr sa modernization railway line Bucharest Giurgiu

Editor’s Recommendations

main event image
Exclusive
10 hours ago

ANALYSIS / When the school system is boiling over: why French high school students block the streets, while Romanian students choose silent protest

main event image
Opinions
12 hours ago

Andrei Cornea: The Unpredictable Mr. Nicușor Dan and the Resentful Mr. Funeriu

main event image
Exclusive
10 hours ago

SPECIAL Informat.ro / Romania in the European press: Top topics from the past two weeks. The political crisis, the topic with the most negative tone

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol