search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
131 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Environmental agreement for the Buzău–Brăila Expressway: the 112 km project enters a new phase

Raluca Ioana Draghici
whatsapp
facebook
linkedin
x
copy-link copy-link
25 May 2026, 20:55
main event image
Current Affairs
shutterstock.com
google-preference

Always see our news on Google

Raluca Giorgiana Dumitrescu, the president of the National Agency for Environment and Protected Areas, signed the environmental agreement for the Buzău–Brăila Expressway project, the institution announced on Monday.


The Buzău-Brăila Expressway project aims to create a section of express road between Buzău and Brăila, in accordance with the environmental objectives of the Local Action Plans for the Environment. It will have a length of 112.4 km, divided into 4 lots, and will be part of the OR3 inter-corridor – Danube. The implementation of the project is included in the General Transport Master Plan of Romania for the period 2016-2030. The positive impact of the project includes traffic flow improvement and decongestion of crowded areas. Environmental protection measures include constructions for water purification, anti-collision panels, sound-absorbing structures, structures for mammal underpasses, and tree plantings. The works will include road junctions, parking lots, and a maintenance center. The contract for the feasibility study was signed in February 2020.

Sources

sursa imagine
Economica
Nouă șosea de mare viteză în România. Drumul Expres Buzău – Brăila a primit acord de mediu
sursa imagine
Ziare.com
Încă un drum expres între două mari orașe din sudul României. Va asigura și conexiunea cu Autostrada A7
sursa imagine
Capital
Modernizarea infrastructurii în estul țării: avans pe Autostrada A7, cu inaugurare în august și undă verde pentru drumul expres Brăila-Buzău
sursa imagine
Stirile ProTV
Drumul expres care va lega două municipii. Pas important pentru începerea construcției

Latest News

22:59

An Indian cargo ship sank in the Red Sea after an attack by Houthi rebels.

22:44

PHG Media Invest is in court against CNA for sanctions applied to Realitatea Plus

22:31

Unit 2 of the Cernavodă Nuclear Power Plant is operating normally under drought conditions.

22:16

Cuba: The UNE Company has announced the restoration of the national electric system, but many areas remain without power.

21:53

The Italian state, required to pay 260,000 euros to a Romanian woman illegally deprived of her liberty.

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
The stage of the works on the Express Road Brăila - Galați has exceeded 97%
event image
Current Affairs
Environmental Agreement for the Brașov - Făgăraș Highway, officially issued
event image
Current Affairs
Lot 6 of the Craiova-Târgu Jiu expressway will have 19.25 km, a viaduct, parking lots with electric charging stations, and a road junction.
event image
Current Affairs
Two new road passages will be built in Ilfov: a three-level passage in Balotești and an underground passage in Bragadiru
event image
Current Affairs
The construction of the Oradea - Arad Expressway could begin this summer, after the project was taken over by CNIR.
event image
Current Affairs
A new road will connect the A0 Highway to Terminal 2 of Henri Coandă Airport, reducing the travel time from 20 to 2 minutes.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
express road buzau Brăila environmental agreement

Editor’s Recommendations

main event image
Exclusive
7 hours ago

ANALYSIS Gianni Infantino and the front of discontent: can the head of FIFA be shaken?

main event image
Exclusive
13 hours ago

EXCLUSIVE Romania, Trump and the new Atlantic equation: how much is the bet on a single man worth

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol