search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
168 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Environmental agreement for the Buzău–Brăila Expressway: the 112 km project enters a new phase

Raluca Ioana Draghici
whatsapp
facebook
linkedin
x
copy-link copy-link
25 May 2026, 20:55
main event image
Current Affairs
shutterstock.com
google-preference

Always see our news on Google

Raluca Giorgiana Dumitrescu, the president of the National Agency for Environment and Protected Areas, signed the environmental agreement for the Buzău–Brăila Expressway project, the institution announced on Monday.


The Buzău-Brăila Expressway project aims to create a section of express road between Buzău and Brăila, in accordance with the environmental objectives of the Local Action Plans for the Environment. It will have a length of 112.4 km, divided into 4 lots, and will be part of the OR3 inter-corridor – Danube. The implementation of the project is included in the General Transport Master Plan of Romania for the period 2016-2030. The positive impact of the project includes traffic flow improvement and decongestion of crowded areas. Environmental protection measures include constructions for water purification, anti-collision panels, sound-absorbing structures, structures for mammal underpasses, and tree plantings. The works will include road junctions, parking lots, and a maintenance center. The contract for the feasibility study was signed in February 2020.

Sources

sursa imagine
Economica
Nouă șosea de mare viteză în România. Drumul Expres Buzău – Brăila a primit acord de mediu
sursa imagine
Ziare.com
Încă un drum expres între două mari orașe din sudul României. Va asigura și conexiunea cu Autostrada A7
sursa imagine
Capital
Modernizarea infrastructurii în estul țării: avans pe Autostrada A7, cu inaugurare în august și undă verde pentru drumul expres Brăila-Buzău
sursa imagine
Stirile ProTV
Drumul expres care va lega două municipii. Pas important pentru începerea construcției

Latest News

22:51

NYT: Jensen Huang, Nvidia’s chief executive, reportedly had ties to a businesswoman suspected by the U.S. of transmitting information to Beijing

22:27

Minister of Labor, Florin Manole, announces that pensions and one-off financial aid payments in December will be paid in full and on time

22:21

Energy Minister Dumitru Chisăliță calls for realistic European rules, investment in grids and affordable energy prices

21:53

Maia Sandu revoked citizenship for three people / Two members of the separatist legislature in Tiraspol are accused of promoting the ideology of the “Russian world”

21:21

HiSky announces that it has paid its outstanding payment obligations to ROMATSA

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
The stage of the works on the Express Road Brăila - Galați has exceeded 97%
event image
Current Affairs
The CNIR issued the Expropriation Decision for the properties along the Focșani-Brăila Express Road route, affecting 3,297 properties and an area of 8,557,483 square meters.
event image
Current Affairs
CNIR is analyzing seven route options for the Bucharest–Giurgiu Motorway
event image
Current Affairs
CNAIR has submitted the documentation for the revision of the Environmental Agreement for section 2 Boița - Cornetu of the Sibiu - Pitești highway.
event image
Current Affairs
Galați: The contract for the modernization of the Berheci-Brăhășești road axis has been signed, worth 111 million lei.
event image
Current Affairs
Radu Miruță signed the financing for the first section of the Craiova–Târgu Jiu expressway
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
express road buzau Brăila environmental agreement

Editor’s Recommendations

main event image
Current Affairs
Yesterday 18:39

Gabriel Ciprian Ene was appointed Secretary-General of the Government led by Luca Niculescu

Sources
imagine sursa
imagine sursa
imagine sursa
main event image
Opinions
Yesterday 08:55

Andrei Pleșu: On Democracy. Notes from the New Europe College

main event image
Exclusive
Yesterday 14:51

EXCLUSIVE The ranking of companies in relevant online sources in Romania: Dacia leads company visibility. Taxation dominates the economic agenda

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol