search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
70 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Irinel Ionel Scrioșteanu announces the installation of the last element of the bridge over the Siret on the Braila-Galati Expressway, which will be opened to traffic by the end of the year.

Liviu Brăteanu
whatsapp
facebook
linkedin
x
copy-link copy-link
28 August 2026, 14:09
main event image
Current Affairs
Foto: Facebook/ Cristian Pistol
google-preference

Always see our news on Google

The Secretary of State in the Ministry of Transport, Irinel Ionel Scrioșteanu, announced that the last element of the bridge over the Siret River, part of the Braila-Galati Expressway (DEx6), is being installed. This bridge will be the most complex in Romania, after the one over the Danube.

Scrioșteanu specified that, by the end of the year, the new expressway will be opened to traffic, according to the contractor's commitment. Recently, a metal deck element was installed, and now the central element, weighing 147 tons, is being installed. The works include the assembly of a heavy-duty crane to facilitate its installation. The complex of bridges on the DEx6 route has a total length of 1.8 kilometers. The investment value is 449.4 million lei, funded by European funds. The road will connect the provinces of Moldova and Muntenia, providing an alternative for heavy traffic on DN22B.

Sources

sursa imagine
Digi24
Se montează ultimul element al podului peste Siret de pe Drumul Expres Brăila-Galați. Când ar putea fi deschisă circulația
sursa imagine
News.ro
Oficial Ministerul Transporturilor: Se montează ultimul element al noului pod peste râul Siret/ Drumul Expres Brăila-Galaţi (DEx6) va fi dat în funcţiune în acest an - VIDEO
sursa imagine
Stirile ProTV
Ministerul Transporturilor: Ultimul element al podului peste Siret, gata de montare. DEx6 se deschide până la final de an

Latest News

23:05

Gheorghe Piperea (AUR) accuses Ciprian Ciucu of not allowing a protest to be organized for Călin Georgescu

22:54

Trump says it is unlikely that he will order new attacks on Iran if negotiations advance

22:36

Traian Băsescu calls for Ursula von der Leyen to be replaced as head of the European Commission

22:25

PNL negotiates a merger by absorption with Forța Dreptei and the establishment of the Modernization Pole

21:59

Poland raised €1.13 million for the police officers injured in the attack in Kraków

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
CNAIR to open the new bridge over the Tisa and the Sighetul Marmației II Border Crossing Point for vehicles weighing up to 3.5 tonnes
event image
Current Affairs
The CNIR issued the Expropriation Decision for the properties along the Focșani-Brăila Express Road route, affecting 3,297 properties and an area of 8,557,483 square meters.
event image
Current Affairs
Radu Miruță signed the financing for the first section of the Craiova–Târgu Jiu expressway
event image
Current Affairs
PMB announces the closure of the construction site at Constanța Bridge around October 15
event image
Current Affairs
The Maramureș–Transcarpathia Bridge was inaugurated over the Tisa River
event image
Current Affairs
CNAIR announces that the tunnels on the A1 Margina–Holdea motorway have been fully excavated, while concreting of the galleries is expected to be completed by the end of the year
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Siret Brăila-Galați Expressway element

Editor’s Recommendations

main event image
International
12 hours ago

POLL Explanations for the Democrats’ victory in the US elections: the cost of living and rejection of Trump

main event image
Opinions
Yesterday 20:01

Sever Voinescu: Merit, Privilege, Responsibility—Total Loss

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol