search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • Latest News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy Policy
Terms and Conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • Latest News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
  1. Home
  2. Current Affairs
172 new news items in the last 24 hours
29 November 15:10

The Minister of Transport, Sorin Grindeanu, announced that as of today it is possible to travel on 109 km of the 121 km Craiova - Pitesti Express Road.

Cristina Petrache
whatsapp
facebook
linkedin
x
copy-link copy-link
main event image
Current Affairs
Foto Facebook/ Sorin Grindeanu
<p>The Minister of Transport announced on Friday that traffic has been opened on 109 km of the 121 km Craiova - Pitesti Express Road. He said that in the first part of next year, the last 12 km will also be completed, providing the connection with the A1 highway, facilitating the circulation from Craiova to Pitești on the high-speed road. A contract worth 439.29 million lei has been awarded to complete the works.

Sources

sursa imagine
Economica
"Autostrada Ford" - DEx12: Tronsonul 1 Craiova - Robănești a fost dat în trafic (Video) - Economica.net
sursa imagine
Economedia
Drumul Expres Craiova - Pitești. CNAIR a inaugurat vineri circulația pe încă 17,7 km, după ce a deschis joi alți 20 km / Compania de Drumuri ratează legătura "cap-coadă" Craiova - București pe drum de mare viteză și în 2024

ȘTIRI PE ACELEAȘI SUBIECTE

event image
Current Affairs
Porr Construct SRL has started the asphalting on lot 4 of the Sibiu – Pitești Highway, with a physical progress of almost 80%, possibility of early completion.
event image
Current Affairs
Work on the Focșani-Bacău section of the Moldova highway is advanced, with 80% completion on the first two sections and 60% on the last, promising to open traffic until Adjud.
event image
Current Affairs
CNAIR announces a progress of 57% on the Suplacu de Barcău – Chiribiș section of the Transylvania highway, with 540 workers and 305 active machines.
event image
Current Affairs
Works on section 4 Tigveni - Curtea de Argeș have reached 77%, with a focus on the Momaia tunnel, the first structure of its kind on a highway in Romania.
event image
Economy
The government approved a financing contract of 500 million euros with the EIB for the works on the A1 Highway, Sibiu-Pitești section.
event image
Current Affairs
The Minister of Transport, Ciprian Șerban, announced the designation of the winner for the feasibility study of the Bucharest–Giurgiu highway, the contract being awarded to the association between Activ Proiectare Infrastructură and an engineering firm from Turkey.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Sorin Grindeanu Minister of Transport express road

Informat Moldova

main event image
Republic of Moldova
28 minutes before

Moldova: The Constitutional Court will examine on October 16 the validation of the election and the mandates of the elected deputies.

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa

Editor’s Recommendations

main event image
Politics
48 minutes before

A new decisive day at the Constitutional Court for the Bolojan Government. The Constitutional Court is expected to decide on Wednesday regarding the laws in the package of 2 measures aimed at reducing the deficit, for which the Government has assumed responsibility in Parliament.

Sources
imagine sursa
imagine sursa
imagine sursa
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • Latest News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy Policy
Cookies Policy
Terms and Conditions
Open Source Licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol