search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
123 new news items in the last 24 hours
  1. Home
  2. Economy

Enery Development has signed a green financing of 460 million euros for the hybrid Ogrezeni project in Giurgiu, which will produce energy for 684,000 households.

Liviu Brăteanu
whatsapp
facebook
linkedin
x
copy-link copy-link
3 March 2026, 14:56
main event image
Economy
Foto: Pixabay
google-preference

Always see our news on Google

The Austrian energy producer Enery Development has secured a syndicated green financing of 460 million euros, intended for the construction of the hybrid project Ogrezeni in Giurgiu County. This project combines photovoltaic energy with battery storage, having an installed capacity of 761 MWp and over 1 GWh of storage.


Once operational, the project will provide green energy for approximately 684,000 households and will reduce CO₂ emissions by about 303,000 tons annually. The financing comes from a consortium of seven banks, including UniCredit and Intesa Sanpaolo. Enery, founded in 2019, manages 66 plants in 6 countries, with a total capacity of 566 MW and 213 MW under construction, with the main shareholder being the Amber Infrastructure fund. The CEO and COO of Enery emphasize the importance of this financing for the development of renewable energy infrastructure in the CEE region.

Sources

sursa imagine
Ziarul Financiar
Producătorul de energie austriac Enery Development ia o finanţare verde sindicalizată de 460 milioane de euro de la un consorţiu format din şapte grupuri bancare, pentru construcţia proiectului hibrid Ogrezeni, în judeţul Giurgiu
sursa imagine
Business Magazin
Producătorul de energie austriac Enery Development ia o finanţare verde sindicalizată de 460 milioane de euro de la un consorţiu format din şapte grupuri bancare, pentru construcţia proiectului hibrid Ogrezeni, în judeţul Giurgiu

Latest News

08:48

Number 2 at the Pentagon visits Cotroceni Palace: Nicușor Dan receives Elbridge Colby for talks about Romania’s security and the threat posed by Russia

08:43

Dominic Fritz: “Electoral massacre in the USA. So let’s not hear any more that we can’t win. A warning to the arrogant crooks in Romania (I’m looking at you, PSD)”

08:34

EXCLUSIVE | November 4, 2026. Online search trends / past 24 hours

08:22

Tugboat sunk in the Black Sea, near Neptun: Three sailors were rescued while four refused evacuation

08:03

Luca Niculescu, on overdue salary rights for magistrates: There will be proposals for scheduling the payment of the amounts owed

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
The Agency for Financing Rural Investments opens, starting September 28, €650 million in funding for the production and storage of green energy
event image
Economy
OMV Petrom and Renovatio have commissioned three photovoltaic parks that supply energy and can power more than 110,000 households
event image
Economy
Hidroelectrica is investing RON 296.8 million in a 64 MW battery storage system at Iron Gates II
event image
Politics
Ilie Bolojan announces €650 million in funding for photovoltaic panels and storage systems intended for public institutions
event image
Current Affairs
The shareholders of Electrica have approved an investment project of 235 million euros for the construction of electricity and thermal energy production facilities in Craiova, including for Ford Otosan.
event image
Economy
Simtel Team has signed a €17.5 million contract for a solar power plant in Alba
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Enery Development Giurgiu hybrid project

Editor’s Recommendations

main event image
International
1 hour ago
Breaking News

Elections in the USA / Democrats gain control of both chambers of Congress

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
+3
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol