Cristian Pistol, director of CNAIR, announced the completion of works on the Tureni Express Road, which will be open to traffic from 14. This new 4.96 km artery will eliminate heavy traffic from Cluj-Napoca, prohibiting the access of about 1,800 trucks over 7.5 tons to the city. The project, carried out by Dimex 2000 and Con-A, was worth 562.6 million lei, financed by the Transport Program. The inauguration was marked by the presence of local officials.
Sources
Drumul Expres Tureni DN1-A3 a fost dat în folosinţă / Autovehiculele de peste 7,5 tone nu mai au acces în Cluj-Napoca
Vestea așteptată de șoferi. Un nou drum expres va fi dat în folosință - Evenimentul Zilei
România va avea un nou drum expres. Tronsonul va facilita accesul șoferilor spre un important oraș din Transilvania
Latest News
23:21
The option of a technocratic government could return to the negotiating table. Ciprian Ciucu: "The President would have tested one or two, three options, but I was not told what those options are."
22:53
The President of Brazil, Lula da Silva, is launching his campaign for a fourth term / He declares himself to be "in excellent shape" at the age of 80.
22:17
Radu Miruță: "It is a complicated situation, a situation that is merely the consequence of poor management of the balance between electricity production and consumption / Romania, for years, has only shut down"
21:50
Fire on a ferry in Indonesia, off the coast of Madura Island: Five people have died and 41 are missing.
21:26
Superliga: Corvinul Hunedoara and Sepsi finished in a draw, 1-1
See more news