search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
142 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Transelectrica informs that the National Electric Power System is facing high operational demand due to the shutdown of the nuclear units at CNE Cernavodă

Emese Grancsa
whatsapp
facebook
linkedin
x
copy-link copy-link
13 May 2026, 12:06
main event image
Current Affairs
Credit foto: shutterstock.com
google-preference

Always see our news on Google

The National Company Transelectrica announced on Wednesday that the National Electric Power System (SEN) is in a state of high operational demand, following the temporary shutdown of the two nuclear units at CNE Cernavodă. Unit 2 was automatically disconnected on May 4 due to a malfunction, and Nuclearelectrica confirmed that it will remain offline for an extended period.

Unit 1 entered a planned shutdown on May 10, 2026. Transelectrica ensures that SEN operates in safe conditions and collaborates with operational entities to maintain the balance between production and consumption. Additionally, the electrical network is interconnected with European systems, which helps increase resilience and reduce the risks of disruptions. Maintenance work will be carried out according to nuclear safety standards.

Sources

sursa imagine
Mediafax
Transelectrica, după oprirea celor două unități nucleare de la CNE Cernavodă: Sistemul energetic întâmpină un „grad ridicat de solicitare operațională”
sursa imagine
Agerpres
Transelectrica: Sistemul Electroenergetic Național întâmpină un grad ridicat de solicitare operațională, dar funcționează în condiții de siguranță
sursa imagine
Ziarul Financiar
Transelectrica: În contextul indisponibilităţii temporare a celor două unităţi nucleare de la CNE Cernavodă, Sistemul Electroenergetic Naţional întâmpină un grad ridicat de solicitare operaţională
sursa imagine
News.ro
Transelectrica monitorizează permanent evoluţia parametrilor şi ia toate măsurile tehnice necesare pentru menţinerea funcţionării în condiţii sigure a reţelei electrice de transport, după oprirea celor două unităţă nucleare de la Cernavodă
sursa imagine
Economica
Transelectrica: sistemul energetic întâmpină un “grad ridicat de solicitare” după oprirea completă a centralei nucleare

Latest News

10:06

The accommodation offer in Cluj-Napoca is almost exhausted, on the occasion of the Untold festival, and tourists who have not booked a room in advance must shell out considerable amounts for a three-night stay.

09:58

The Slavneft-Yanos refinery in Yaroslavl, the largest in central Russia, was attacked by Ukrainian drones for the second consecutive night.

09:45

A tanker reported two explosions in the Strait of Hormuz, near Oman. The incident did not cause damage to the crew.

09:33

George R.R. Martin reveals that the depression of the last year has led to the delay of the sixth volume in the series "A Song of Ice and Fire": "Aging is not fun at all"

09:19

August 6, 2026. TV: What was discussed last night on the news channels

See more news

NEWS ON THE SAME TOPICS

event image
Economy
Transelectrica announces that the National Electric Power System operates safely, despite the shutdown of Unit 1 of the Cernavodă Nuclear Power Plant. Energy consumption will be covered through imports.
event image
Current Affairs
CNE Cernavodă has decided to keep Unit 2 operational, after analyzing the operating parameters.
event image
Current Affairs
Energy crisis at the nuclear power plant in Cernavodă: The Ministry of Energy estimates the reconnection of Unit 2 in June 2026
event image
Current Affairs
Transelectrica announces that it operates the National Electric Power System in "difficult conditions" due to severe drought.
event image
Current Affairs
Unit 1 of the Cernavodă Nuclear Power Plant has been reconnected to the National Energy System
event image
Current Affairs
Unit 2 of the Cernavodă NPP will be shut down in a controlled manner due to the low flow of the Danube.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Cernavoda Transelectrica energy system

Informat Moldova

main event image
Republic of Moldova
1 hour ago

A 'Geran-2' type drone was detected in the outskirts of the village of Văleni, Cahul district, Republic of Moldova.

Sources
imagine sursa
imagine sursa
imagine sursa

Editor’s Recommendations

main event image
Current Affairs
55 minutes ago

Electricity consumption in Romania reached one of the highest levels this summer on Wednesday evening, despite the Government's calls for savings.

Sources
imagine sursa
imagine sursa
main event image
Politics
2 hours ago

George Simion, about the suspension of President Dan: "We already have a significant number of signatures. We will create a platform where every Romanian will be able to see if their parliamentarian has signed for the suspension or not."

Sources
imagine sursa
imagine sursa
imagine sursa
main event image
Exclusive
48 minutes ago
Original Content

August 6, 2026. TV: What was discussed last night on the news channels

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol