search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
64 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Sibiu-Pitești Highway, section 2: the builders have entered the execution phase at the third tunnel

Emese Grancsa
whatsapp
facebook
linkedin
x
copy-link copy-link
13 June 2026, 12:10
main event image
Current Affairs
Credit foto: shutterstock.com
google-preference

Always see our news on Google

The works on the second section of the Sibiu-Pitești highway, which includes 31.33 kilometers of road, have entered the execution phase for the third tunnel. On the construction site, the builders of the Mapa-Cengiz Association are simultaneously working on the Balota, Robești, and Boița tunnels, mobilizing approximately 562 workers and 155 machines. At the Balota tunnel, the first 16 meters have been excavated, while at Robești, the work stage has reached 36%, with the excavation of both galleries completed. At the Boița tunnel, 87 meters have been excavated on one gallery and 21 meters on the other, with a progress rate of 17%. Although the physical progress for the entire section has reached 11.63%, the works depend on the release of the revised Environmental Agreement by the Ministry of Environment. This section is considered the most difficult of the A1 highway, having a value of 4.25 billion lei, excluding VAT, and will connect Transylvania with Muntenia.

Sources

sursa imagine
Digi24
Avans pe Autostrada Sibiu-Pitești: un nou tunel a intrat în lucru
sursa imagine
Mediafax
Se lucrează simultan la trei tuneluri pe A1 Sibiu–Pitești. Noi progrese pe autostrada care traversează Carpații
sursa imagine
Stiripesurse
VIDEO Progres major pe autostrada care străpunge Carpații: Se lucrează simultan la trei tuneluri
sursa imagine
Economica
VIDEO Autostrada A1 Sibiu – Pitești: Turcii de la Mapa – Cengiz au început lucrările la al treilea tunel din secțiunea 2
sursa imagine
Newsweek
Progres pe autostrada Sibiu-Pitești. Se lucrează simultan la trei tuneluri * Newsweek România
sursa imagine
Capital
Al treilea tunel de pe Autostrada Sibiu–Pitești a intrat în execuție. Lucrările avansează pe cea mai dificilă secțiune a A1
sursa imagine
Antena3
Avansează lucrările pe Autostrada Sibiu-Pitești. Al treilea tunel de la Boița-Cornetu, în execuție. Cele mai noi imagini de pe șantier

Latest News

00:32

Aleksandar Vucic acknowledges the student opposition’s victory in Serbia’s snap election

22:56

Germany will participate with aircraft in the first military exercise of the Coalition of the Willing for Ukraine, which will also partly take place in Romania

22:37

Alexandru Nazare, on the audit requested by Sorin Grindeanu at all ministries: “There is absolutely no problem, it is actually a joy”

22:23

Traian Băsescu claims that Sorin Grindeanu will control the government through Marian Neacșu, while Prime Minister Luca Niculescu could become the target of criticism

22:09

Tens of thousands of Czechs protested in Prague against the reform of public media funding

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
CNAIR announces the completion of excavation for both bores of the Boița 1 Tunnel on the Boița-Cornetu section of the Sibiu-Pitești Motorway
event image
Current Affairs
The first drilled highway tunnel in Romania, almost ready!
event image
Current Affairs
Turkish construction workers have broken through the second bore of the Boița 1 tunnel on the A1 Sibiu–Pitești motorway. The works have reached 45.11%.
event image
Current Affairs
A new section of the Sibiu-Pitești Highway could be opened this year
event image
Current Affairs
DRDP Craiova announces the completion of over 80% of the infrastructure for the TBM that will bore the Poiana Tunnel
event image
Current Affairs
The works on the Boița Viaduct are progressing, but the lack of building permits limits activities to 45% of the total. Three sections of the Sibiu - Pitești highway are underway.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
highway Sibiu Pitesti

Editor’s Recommendations

main event image
Opinions
24 October 2026, 20:53

Sever Voinescu: Playing at Sovereignty

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol