search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
170 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Termoenergetica has repaired the damage to the 40-year-old pipe, but it can take up to 12 hours to refill the network, leaving thousands of Bucharest residents without hot water.

Andreea Lificiu
whatsapp
facebook
linkedin
x
copy-link copy-link
20 August 2025, 14:24
main event image
Current Affairs
https://www.pexels.com/
google-preference

Always see our news on Google

Termoenergetica crews have completed work to fix a 40-year-old main pipeline failure. Although the damage was repaired on August 19, the gradual re-filling of the network, which is essential to prevent new cracks, can take up to 12 hours. This affects the delivery of hot water to thousands of residents in sectors 2, 3 and 4 of the capital, who have been without hot water for three days. Termoenergetica apologizes for the inconvenience caused and assures that its teams are mobilized to resume the supply safely.

Sources

sursa imagine
Stirile ProTV
Termoenergetica: Avaria la conducta veche de 40 de ani a fost remediată. Reumplerea rețelei poate dura până la 12 ore
sursa imagine
G4Media
Criza apei calde pentru jumătate din locuitorii Bucureștiului: Termoenergetica a remediat avaria la conducta veche de 40 de ani, dar reumplerea treptată a reţelei poate dura chiar şi 12 ore
sursa imagine
News.ro
Echipele Termoenergetica au finalizat, în 19 august, lucrările de remediere a avariei la conducta magistrală veche de 40 de ani, dar procesul complet pentru reumplerea treptată a reţelei poate dura chiar şi 12 ore
sursa imagine
B365
ESENȚIAL | Avaria majoră de la Termoenergetica a fost rezolvată. Bucureștenii au din nou apă caldă în parametrii normali, după trei zile
sursa imagine
Digi24
Avaria care a lăsat jumătate din București fără apă caldă a fost remediată. Când va fi finalizată încărcarea rețelei

Latest News

23:00

Sorin Grindeanu wants the position of prime minister / PSD has not “drawn red or green lines, so that we can make a traffic light”

23:00

Transelectrica launches the pilot project to digitalize the Alba Iulia substation, an investment of 476 million lei

22:53

Bolojan, on American gas: Romania supports the Vertical Corridor, but does not need LNG imports

22:50

Ilie Bolojan, on the possibility of snap elections: “They are not a magic solution to all problems. If no solution is reached, then it is the only formula through which you can move things forward”

22:45

Cătălin Predoiu warns that snap elections could deepen political instability and calls for the reconstruction of the former governing coalition

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Termoenergetica begins work in Sectors 4 and 5, and over 1000 apartment blocks will temporarily be without hot water
event image
Current Affairs
Major breakdown on the Berceni Pipeline: Sector 4 remains without hot water
event image
Current Affairs
Bucharest City Hall: 66 blocks in Aviației and Dorobanți will have hot water through a new pipeline
event image
Current Affairs
Hot water will be interrupted in several areas of Bucharest in the second half of July for works on the thermal network.
event image
Current Affairs
Bucharest City Hall replaced 28 kilometers of district heating pipes
event image
Current Affairs
Due to the shutdown of CET Sud, 1,395 blocks in Bucharest have inadequate hot water, especially affecting the Titan neighborhood.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Thermoenergy Crash remedies unirii square hot water

Editor’s Recommendations

main event image
Economy
4 hours ago

The Ministry of Finance maintains the 25% reduction in the excise duty on diesel, amid international pressures on fuel prices

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
main event image
Exclusive
13 hours ago

EXCLUSIVE Monitorul Miniștrilor by NewsVibe: September 24–30, 2026 / Visibility boost for ministers during the week of hearings in Parliament

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol