search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
58 new news items in the last 24 hours
  1. Home
  2. Current Affairs

The National Road Investment Company has extended the deadline for submitting bids for the design and execution of Lot 2B Grințieș-Pipirig on the A8 highway.

Raluca Niculae
whatsapp
facebook
linkedin
x
copy-link copy-link
21 February 2025, 13:28
main event image
Current Affairs
Foto:Credit: Jon G. Fuller / Vwpics / Zuma Press / Profimedia
google-preference

Always see our news on Google

CNIR has extended the deadline for submission of bids for the design and execution of Lot 2B Grințieș-Pipirig of the A8 Motorway until March 5, 2025, due to technical problems registered in SEAP. Lot 2B has a length of 31.5 km, an estimated value of 6.9 billion lei and a completion deadline of 54 months. It includes 16 tunnels, 60 bridges and viaducts.

Sources

sursa imagine
Capital
Licitația pentru lotul 2 al Autostrăzii Unirii A8, prelungită până la 5 martie. Contract de 6,9 miliarde lei
sursa imagine
News.ro
Termenul de depunere a ofertelor la contractul pentru construirea lotului 2 B Grinţieş-Pipirig de pe secţiunea montană a Autostrăzii Unirii A8 a fost prelungit până la 5 martie 2025. Contractul se ridică la 6,9 miliarde lei, fără TVA
sursa imagine
Economica
Autostrada Unirii A8: CNIR a prelungit până pe 5 martie termenul de depunere a ofertelor pentru cel mai dificil lot, Grințieș - Pipirig - Economica.net

Latest News

23:14

A small aircraft crashed on Saturday in Ganderkesee, Germany, causing the death of one person on board.

23:10

France will make prior consent from consumers mandatory for telemarketing calls starting from August 11.

23:05

Kazakhstan becomes the first country in Central Asia to launch electric eVTOL air taxis.

22:58

Traian Băsescu states that Romania must negotiate with Ukraine to prevent incidents with drones

22:51

The USA is preparing a plan for the confiscation of enriched uranium from Iran, in the context of failed negotiations.

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
CNIR has handed over the site of lot 2B Grințieș-Pipirig of the A8 Highway to the contractor UMB. The works will include 16 tunnels and 60 bridges.
event image
Current Affairs
CNIR signed a contract with FCC Construccion for section 3 Lețcani - DN 24 of the A8 Highway, worth 3.93 billion lei
event image
Current Affairs
The CNIR issued the order to suspend the design of sections 1 and 3 of the Unirii A8 Highway. The total length will be 45 km.
event image
Current Affairs
The works on A0 North, lot 1 (Joița-Corbeanca), have reached a physical stage of 63%
event image
Current Affairs
CNIR expropriates 106 properties for the A3-DN 1P road junction in Bihor
event image
Current Affairs
The director of CNAIR announces the completion of the works on lot 2 of the A7 highway at a rate of 95%. Traffic has been partially opened between Domnești Târg and Adjud.
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
highway a8 works auction retrieve

Editor’s Recommendations

main event image
Current Affairs
Yesterday 13:51

The Romanian Army responds to criticism regarding the cost of missiles: "The safety of citizens has no price"

Sources
imagine sursa
imagine sursa
imagine sursa
main event image
Exclusive
Yesterday 09:15
Original Content

IT News Review by Control F5 Software: The United Kingdom proposes a voluntary nighttime restriction for social networks

main event image
Opinions
24 July 2026, 08:55

Andrei Cornea, Dilemma: Odysseus Among Us

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol