PRIMA Solis will include nine residential buildings with 950 apartments on a 37,000 square meter site, equipped with more than 1,000 parking spaces and 60 charging stations for electric cars. The project, the first urban regeneration project on the former Antrefrig industrial platform, will be realized in four phases, with the first phase estimated for delivery in summer 2027. The total value of the development amounts to €140 million, including 2,500 sqm of commercial space. PRIMA Development Group, with over 20 years of experience, is a major player on the Romanian real estate market.
Sources
PRIMA Development Group începe lucrarile la ansamblul rezidenţial PRIMA Solis pe locul fostei platforme industriale Antrefrig din Bucureşti. Proiectul va avea nouă clădiri de locuinţe, iar valoarea totală a dezvoltării se ridică la 140 de milioane de euro
FOTO Apartamente în locul unei foste fabrici. Cel mai ambițios proiect din capitală al Prima Development Group
Încă o fabrică din București se transformă în apartamente, proiect de 140 mil. euro
Dezvoltatorul imobiliar Prima Development Group din Oradea investește 140 de milioane de euro într-un ansamblu rezidențial în sectorul 2 al Capitalei, pe fosta platformă industrială Antrefrig
Latest News
11:23
Nicușor Dan: "It is unacceptable and intolerable". The president announces that the diplomatic protest against Russia will be based on the investigation regarding the downed drones.
11:17
Brazilian authorities rejected visa requests for two officials of the Trump administration, suspecting interference in the presidential elections in October.
11:00
A new drone was shot down on Sunday morning by an F-16 of the Romanian Air Force, in the Sulina–Chilia area.
10:41
Ford recalls 565,691 Bronco and Bronco Raptor vehicles due to an electrical failure that may cause fires.
10:30
Kuwait Petroleum Corporation has signed a 16 billion dollar agreement with Blackstone, Brookfield, and KKR for the transfer of the national oil pipeline network.
See more news