search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
108 new news items in the last 24 hours
  1. Home
  2. Current Affairs

OMV Petrom will build four photovoltaic parks with a total capacity of 550 MW, with completion estimated in 2026, with an investment of over 400 million euros.

Cristiana Dida
whatsapp
facebook
linkedin
x
copy-link copy-link
22 December 2025, 12:49
main event image
Current Affairs
Foto: Pixabay
google-preference

Always see our news on Google

OMV Petrom will develop four photovoltaic parks in Ișalnița, Tismana, and Rovinari, with a total installed capacity of approximately 550 MW, with an estimated completion in 2026. The total investment value exceeds 400 million euros, of which 70% is financed by the Modernization Fund. The projects are carried out in partnership with CE Oltenia, each holding a 50% stake.


The energy produced will cover the annual consumption of about 410,000 households, contributing to national and European climate objectives. OMV Petrom also supports the RenewAcad program, which has retrained over 200 mining technicians into solar system installers, as part of Romania's energy transition efforts. OMV Petrom is the largest integrated energy producer in Southeast Europe, with a refining capacity of 4.5 million tons annually.

Sources

sursa imagine
Economica
A început construcția parcurilor fotovoltaice de 550 MW ale Petrom și CE Oltenia. Vor fi gata anul viitor
sursa imagine
Hot News
Două mari companii au început construcția unor parcuri fotovoltaice care vor acoperi consumul a peste 400.000 de gospodării din România
sursa imagine
Ziarul Financiar
Bursă. OMV Petrom şi CE Oltenia încep construcţia parcurilor fotovoltaice cu o capacitate totală de circa 550 MW, investiţie de peste 400 mil. euro

Latest News

21:05

University of Craiova missed qualification in the main phase of the Europa League

20:32

Poland does not want nuclear warheads on its territory, said Deputy Minister of Defense, Pawel Zalewski.

19:56

Daniel Bîrligea was officially presented at Frosinone. He will play on loan until the end of the season, with an obligation to buy.

19:34

Drone detected by MApN radars near Snake Island / Two Spanish F-18 aircraft were scrambled for monitoring

19:27

CNAIR: Another 47 kilometers of the A7 Highway, between Adjud and Bacău, will open to traffic on Monday.

See more news

NEWS ON THE SAME TOPICS

event image
Current Affairs
Rompetrol will build a 4.8 MW photovoltaic power plant at the Vega Ploiești Refinery, with an investment of 27 million lei
event image
Economy
OMV Petrom has signed a contract with OMV Downstream for the delivery of sustainable aviation fuel and hydrotreated vegetable oil, with deliveries starting in 2028.
event image
Current Affairs
Solar Lady, the largest solar power plant in Europe, has received the establishment authorization from ANRE for the first phase of the project.
event image
Economy
MVM Energie Romania has received ANRE authorization for the development of a photovoltaic park in Covasna. The project will be carried out on 20 hectares.
event image
Current Affairs
OMV Petrom has completed a project supported by the EU for the expansion of the electric vehicle charging network in Central Europe, with 384 ultra-fast charging points.
event image
Economy
Enevo Group and Kraftfeld are building a 220 MWh energy storage system in Drăgănești-Olt
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
OMV Petrom parks photovoltaic park Modernization Fund Energy

Editor’s Recommendations

main event image
Current Affairs
3 hours ago

Nicușor Dan, in an editorial for Fox News: "Romania will not wait to be put to the test before being ready"

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
main event image
Current Affairs
4 hours ago

Russia reacts after Romania destroyed a maritime drone in the Black Sea

Sources
imagine sursa
imagine sursa
imagine sursa
main event image
Education
9 hours ago

Special Informat.ro / From backpack to after-school: the real bill of the beginning of the school year

main event image
Current Affairs
1 hour ago

Drone detected by MApN radars near Snake Island / Two Spanish F-18 aircraft were scrambled for monitoring

Sources
imagine sursa
imagine sursa
imagine sursa
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol