search icon
search icon
Flag Arrow Down
Română
Română
Magyar
Magyar
English
English
Français
Français
Deutsch
Deutsch
Italiano
Italiano
Español
Español
Русский
Русский
日本語
日本語
中国人
中国人

Change Language

arrow down
  • Română
    Română
  • Magyar
    Magyar
  • English
    English
  • Français
    Français
  • Deutsch
    Deutsch
  • Italiano
    Italiano
  • Español
    Español
  • Русский
    Русский
  • 日本語
    日本語
  • 中国人
    中国人
Sections
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
About Us
Contact
Privacy policy
Terms and conditions
Quickly scroll through news digests and see how they are covered in different publications!
  • News
  • Exclusive
    • INSCOP Surveys
    • Podcast
    • EU
    • Diaspora
    • Republic of Moldova
    • Politics
    • Economy
    • Current Affairs
    • International
    • Sport
    • Health
    • Education
    • IT&C knowledge
    • Arts & Lifestyle
    • Opinions
    • Elections 2025
    • Environment
70 new news items in the last 24 hours
  1. Home
  2. Current Affairs

Hidroelectrica has awarded the contract for a floating photovoltaic panel system, marking an important step in the diversification of renewable energy sources.

Raluca Ioana Draghici
whatsapp
facebook
linkedin
x
copy-link copy-link
26 June 2025, 08:15
main event image
Current Affairs
ww.shutterstock.com
google-preference

Always see our news on Google

On June 26, 2025, Hidroelectrica announced the award of the contract for the construction of a floating photovoltaic panel system under the Nufărul Pilot Project, worth 39,250,000 lei. The project will increase renewable electricity generation capacity and diversify the company's portfolio. Located on the reservoir of the Hidroelectrica Ipotești power plant, the system will include 10 MW photovoltaic panels, generating about 13.4 GWh/year. The works will last 14 months and will involve modern equipment and sustainable solutions.

Sources

sursa imagine
Financial Intelligence
Hidroelectrica anunță atribuirea contractului pentru realizarea sistemului flotant de panouri fotovoltaice „Proiect Pilot Nufărul”
sursa imagine
Economica
Românii de la Waldevar vor instala primul fotovoltaic plutitor al Hidroelectrica, de 10 MW, pe lacul Ipotești
sursa imagine
Mediafax
Panouri fotovoltaice plutitoare pe un lac din Olt. Hidroelectrica dă startul la „Proiect Pilot Nufărul”
sursa imagine
NewMoney.ro
Hidroelectrica anunță atribuirea contractului pentru realizarea unui sistem flotant de panouri fotovoltaice, în Județul Olt
sursa imagine
Economedia
Hidroelectrica a atribuit contractul de aproape 40 de milioane de lei pentru realizarea primului sistem flotant de panouri fotovoltaice al companiei, în Olt. Waldevar preia proiectul

Latest News

18:50

The wildfire in Reșița has reignited, and additional forces have been mobilized to extinguish it, including a helicopter.

18:40

A lottery winner from Padova who became a millionaire in 2019 is at the center of a post-mortem legal dispute.

18:26

The National Cyber Security Directorate draws attention to a method of fraud that uses Facebook groups to promote fake loans.

18:10

Ursula von der Leyen announced that the majority of the 60,000 migrants who entered illegally in Ceuta have returned to Morocco, without reaching mainland Spain or the rest of the EU.

17:58

The Ministry of Finance will borrow 7.2 billion lei from banks in August 2026 for the refinancing of public debt and financing of the budget deficit.

See more news

NEWS ON THE SAME TOPICS

event image
Economy
Hidroelectrica has signed the contract for the construction of the Tudor Vladimirescu Photovoltaic Power Plant, in Braila County
event image
Economy
Electrica has signed an EPC contract with Foton Power Energy S.R.L. for the photovoltaic project 'Bihor 1', which includes a capacity of 78.8 MWp and a 110 kV transformer station.
event image
Current Affairs
The Austrian company Enery has started the construction of a hybrid photovoltaic park in Ogrezeni, Giurgiu, with an investment of 460 million euros.
event image
Economy
Hidroelectrica made investments of 90 million lei in the first three months of 2026, 72% more than last year, but below 9% of the annual budget
event image
Current Affairs
Romania recorded on Wednesday the highest electricity production from photovoltaic sources, exceeding 2,500 MW and covering 60% of national consumption.
event image
Economy
Enevo Group and Kraftfeld are building a 220 MWh energy storage system in Drăgănești-Olt
app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview app preview
Hidroelectrica floating photovoltaic panels renewable energy electricity

Editor’s Recommendations

main event image
Economy
11 hours ago

Fitch maintains Romania's rating at BBB-. The country avoids downgrade to 'junk' status.

Sources
imagine sursa
imagine sursa
imagine sursa
imagine sursa
imagine sursa
main event image
Exclusive
7 hours ago
Original Content

IT News Review by Control F5 Software: AI cameras can detect phone use while driving

main event image
Education
8 hours ago

QX reforms enter the trial year: major changes in schools, universities, and research in 2026–2027

main event image
Opinions
Yesterday 15:18

Andrei Cornea: The Fatalist. An X-ray of Conspiracy Theory

app preview
Personalized news feed, AI-powered search, and notifications in a more interactive experience.
app preview
app store badge google play badge
  • News
  • Exclusive
  • INSCOP Surveys
  • Podcast
  • EU
  • Diaspora
  • Republic of Moldova
  • Politics
  • Economy
  • Current Affairs
  • International
  • Sport
  • Health
  • Education
  • IT&C knowledge
  • Arts & Lifestyle
  • Opinions
  • Elections 2025
  • Environment
  • About Us
  • Contact
Privacy policy
Cookies Policy
Terms and conditions
Open source licenses
All rights reserved Strategic Media Team SRL

Technology in partnership with

anpc-sal anpc-sol